Johandup Posted December 23, 2017 Share Posted December 23, 2017 Has anyone tried this? http://www.electrodev.co.za/shop/dls/ Quote Link to comment Share on other sites More sharing options...
maxomill Posted December 23, 2017 Share Posted December 23, 2017 i have not tried that particular one but I did have the onesto LSR connected to my old system . it controlled the power from the inverter and gave the house priority , so if the house was not drawing more than 1200 w for thirty seconds then the swimming pool pump could work. The main reason for placing it in the circuit was so as not to ever overload my system with every thing running at the same time and drain my battery bank . my battery bank had a voltage comparator in the system which would switch back to Eskom at a set voltage so indirectly the Load shed relay would stop the bats from being drawn down too quickly can I ask why or what you want to do with one as im sure it could be used for lots of other things cheers Quote Link to comment Share on other sites More sharing options...
Johandup Posted December 24, 2017 Author Share Posted December 24, 2017 Thanks for the reply. This is the only way (for now) to manage loads vs input automatically and to prevent overloading of systems I am amazed that nothing is written about these usefull devices . Chris Hobson 1 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.