November 4, 20214 yr Hi Guys I need some assistance with my install 5kw SNA inverter 7 x 455W Longi Panels 1 x 5.1 Kwh Lithium battery. I've set up the battery and the is comms between the BMS and the inverter. There is currently no WiFi on site as yet, so im commissioning with the onboard keypad. So , which setting is for the following. Operating preference 1 .PV to charge the battery and supply the loads, AC to supply the load if both PV and Battery is not enough 2. Charge the battery with PV only 3. Set back to grid when the battery depletes to 30%
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.