Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Starting my DIY solar installation. Version 2

Featured Replies

Hi everyone,

Last year, after numerous power outages in my area I decided to go fully (more or less) off grid. I have an existing system (3kw RCT vmII, 2.8kw Hubble battery) that covers some stuff, but not enough to carry on normally during an area outage. That runs on a completely separate grid to the house mains. I'll be leaving that in place until the batteries or inverter dies.

The new system is 2 x Solis S6 pro 6KW inverters paralleled for 12KW output. 12 x 550w Jinko solar panels, split in 2 strings to maximise morning and afternoon sun. The roof gets partially shaded by the neighbours tree in the morning and councils tree on the pavement in the afternoon. 3 x Dyness BX51100 batteries, rated at 0.5C. I may add to these depending on how my usage goes in winter. I'm not looking to feed back to the grid, I don't even think it's a possibility in my municipality yet, so I plan to run the system in islanding mode most of the time. I'm not splitting my load into essential vs non essential. I want everything to run as essential so I'm thinking of just using my existing DB. I've attached a basic plan of my wiring. I just want to check if I'm missing something. The existing DB is in my passage, so the inverter an batteries are installed in another room a couple meters away. I'm not sure if I should have an addition mini DB to cut off power to the inverter at the inverter or if the initial circuit breaker at the passage DB is enough. I was told that the inverters have isolation for the PV so I don't need an additional one for that. Is that true or should I also have an Isolator for each solar string? 

So the plan is to take the Eskom mains out of the existing DB and move it into a smaller DB that contains a breaker for the inverter and then goes to a changeover switch on another board to divert power from mains or the inverter. Am I creating too many sub boards? 

Also, if I have a surge arrestor coming in at the Eskom mains, and one at the inverter output, should I put another one at the existing DB input? Or is that creating too many routes? 

Grateful for any advice you've got.

 

Solar - Google Sheets_page-0001.jpg

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.