Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Jon Siko

Members
  • Joined

  • Last visited

  1. Jon Siko joined the community
  2. Can someone advise whether it's possible to take a step-by-step approach to getting off-grid? I'm currently using between 25-30 kWh per day of which 50% is because of the geyser. I'm hoping to do the following migration over 18 months: Step 0: Reduce Load - approx R 33,000 in month 0 1 x replace Electric Stove with Gas Stove 1 x replace 200L Geyser with Evacuated Tube Thermosiphon Solar Water Heating Geyser/Kit Step 1: Battery Backup System - approx R 55,000 in 7 months 1 x Hubble AM-2 110AH 5.5kWh Lithium Battery 1 x SunSynk 5KW 48V Hybrid Inverter 1 x KETO Battery Disconnector with 125A Fuses Step 2: Battery Backup System - approx R 30,000 in 4 months 1 x Hubble AM-2 110AH 5.5kWh Lithium Battery Step 3: Solar Panels - approx R 20,000 in 2½ months 4 x Canadian Solar HiKu 380W Solar Panels 4 x Tile Roof Mounting System Cabling Repeat Step 3 x 2-3 more times Total cost (Steps 1-3): R 145,000 (or R 8,000 x 18 months)

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.