February 12, 20233 yr Installed our old inverters at my brothers house along with our 3 'old' lithium batteries. 2 x TheSunPays 4kw Axpert Clones 3 x TheSunPays 4.8kw LiFePO4 batteries Still need to label everything and install the changeover switch. Electrician will come in to do hook up to DB board, final commissioning and CoC. 4 x 60A isolators on the bottom left are AC IN and AC OUT isolators per inverter so that should we need to service each inverter individually while the other remains in operation, we can do so safely, something I see missing in most installs. Many installs I've see require you to either shut down Grid completely or the entire system if work on 1 inverter is required. DB box above the 4 x 60A isolators contains 2 x 'Primary' isolators for Grid AC and Inverter AC and a surge protector, changeover switch to be added here. No Solar installed yet, this will just act as a whole house UPS to cover during loadshedding. Edited February 12, 20233 yr by Bl4d3
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.