Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Frank W

Members
  • Joined

  • Last visited

  1. I have a totally DIY photovoltaic installation, it has 12 405W monocrystalline panels, a Goodwe 5048D-ES inverter, a DIY battery with 16S 280A LiFePO4 cells controlled by a 48V 150A Seplos BMS. The cells are protected by 100A fuse, the battery switch is a 2P DC 600V 100A MCB circuit breaker for PV systems (100A is the maximum charging and discharging current of the inverter). The BMS communicates via Pylontech protocol. Monitoring is done through PV Master, which is very basic, or through the SEMS web portal, which is very slow. My problem is that I have burned two MCBs, only the negative line (the fuse remains intact) and I would like to monitor the charge/discharge currents in shorter time intervals.
  2. If this is not the right thread, can you tell me where I move the following message. Thank you
  3. Hello, I just found this forum on photovoltaic energy and I found it very interesting, so I will try to explain a small problem, I apologize since English is not my language.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.