Hi All, this is my first post on this forum. I have been trying to establish BMS communication between a GROWATT 5000TL HVM and a Shoto SDA10 5.12 KWH using a cable that was manufactured based on information from each respective manual. When connected between the BMS RJ45 port on the inverter and the CAN port on the battery, I get 4/20 error on the display of my inverter indicating a BMS communication error. The inverter firmware is 500.08/002.00/null and I am also using a wifi data logger ShineWifi-S with firmware 1.7.6.6. I have tried numerous settings on option 36 (LI02, LI07, LI51,LI52) but the red fault indicator still remains on with the 4/20 error displayed.
Is the custom cable configured correctly?
Does the cable on the inverter side require a ground pin as it currently only has two pins configured (CANH & CANL), the battery side has two pins going to ground in the cable shield (See attached)?
Has anybody out there got the BMS working correctly between these two pieces of equipment?
I was also told by my installed that the battery does not need an earth if I am running a single battery, not sure if this is accurate?
Shoto Growatt custom cable RJ45 pinouts.docx