Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

JLER3

Members
  • Joined

  • Last visited

  1. Coulomb. No PV panels installed yet. Just want to use the system as a backup during load shedding. Switchover from Utility to Inverter very smooth. Code 08 - Bus voltage to high. What I noticed is that during while running in backup mode the frequency is only 41Hz instead of 50 Hz.
  2. JLER3 joined the community
  3. Just installed a new 48V 5KVA inverter with 4x 100Ah gel batteries. Backup DB has 25A input and output breakers with 3-way bypass switch and 125A DC circuit breaker. When testing the system I switch off main switch on main DB to activate the backup system. The changeover from ESKOM to inverter is faultless BUT the lights does a short flick every 10 - 20 seconds. A typical relay click is heard from the inverter. Red light on screen shows code 08 - Bus voltage to high. How can I fix this problem. Thanks Johan.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.