Hi Steve, thanks for the valuable information.
I found this in the Sunsynk installation manual, but it only mentions RS485 Protocol. So i would think the Meter_Com port would use the same configuration as it is the same protocol.
Hi
I'm new to the forum and have a Sunsynk 8kw inverter connected to 2 x Hubble AM2 5.5kw batteries.
I couldn't get the CT coil to work properly because the DB board is 30m away from the inverter and i am about to purchase a Chint DDSU666 single phase smart meter. I know the wires from the CHINT needs to be from terminal 7 (A) and 8 (B) to the Meter_COM port on the Sunsynk. But i don't which pins they need to be on the RJ-45 going into the Meter_COM port. Has anyone done this before or can anyone share info on the Meter_COM pinout?
Regards,
Rakesh