Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

saddm

Members
  • Joined

  • Last visited

  1. System Configuration: Inverter Model: Deye SUN-50K-SG01HP3-EU-BM4 (Hybrid High-Voltage Inverter). Battery System: 2x Pylontech PowerCube-M1-C Racks. Total Battery Modules: 44x H32148-C modules (distributed as 22 modules per rack). Battery Management System: 2x SC1000-200J-C high-voltage BMS controllers (1 controller per rack). Proposed Topology & Design: I intend to fully utilize the inverter's capability of having two completely independent battery ports (both Power and BMS communication ports), thereby eliminating the need for a central MBMS1000 controller. To achieve this independent dual-rack configuration, I plan to implement the following setup: BMS Address Configuration (DIP Switch Settings): Rack 1 (BMS 1): Set Address to 000001 Rack 2 (BMS 2): Set Address to 100001 Hardware & Communication Wiring: Rack 1: Connected directly to Battery Port 1 (Power Port 1 + BMS Communication Port 1). Rack 2: Connected directly to Battery Port 2 (Power Port 2 + BMS Communication Port 2). Technical Inquiry: Is this configuration feasible and safe to implement? * Will the inverter correctly recognize and manage both BMS units independently via Port 1 and Port 2 without causing any parallel synchronization faults or communication conflicts? Could you please verify if the current firmware version for this specific S/N supports this setup, or if a remote firmware upgrade isrequired? Rack Powercube M1 (H32148) (1).pdf MBMS2613-Datasheet.pdf SUN-50K-SG01HP3-EU-BM4.pdf
  2. It is true that the settings for 12, 13, 29 were set based on SOC%, but what appears on the inverter screen when turned on is the battery voltage, and I cannot get the SOC% storage percentage. This is strange because in deye devices, I can do that, but in voltronic, I can only set the settings in degrees Celsius.
  3. Can the Voltronic Expert Max E 11kw read the soc% of Pylontech uf5000 batteries (five batteries) via RS485, knowing that I set the function 1=SBU12=10%, 13=15%, 29=5%? Or read voltage from dc bus?? Is this values reasonable? And if utility power always exist, does inverter use utility onley between SOC%(10-15)
  4. Just one battery Message 69 always appears on the inverter screen, but it can only be discharged. I waited until the battery reached 30% discharge and the message did not disappear. Note that I set 1 sbu 2 50A 5 lib 12 20% 13 40% 16 oso 26 55.8 27 55.8 29 48
  5. In the battery screen
  6. I connected a Restar company 5k lithium battery to an axpert-vm-iii-6k-twin-off-grid inverter and after a few seconds an error 69 appears even though the battery screen shows that the charge percentage is 50% Can anyone solve this problem?!!
  7. saddm joined the community
  8. What about flooded batteries, I set as below: 1- SbU,2-20A,3-UPS,5-Fld,12-46,13-57,16-OSO,26-58.4,27--54,the reminder I leave it as default

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.