Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

ym8016

Members
  • Joined

  • Last visited

Reputation Activity

  1. Like
    This has been running for the past four years without any issues. You only need gas CoC after the installation of the gas water heater, not electric CoC. Nothing will blow up even if you go from 0 to 75 deg, the gas water will ignite and heat up water and when water from the electric geyser at 75 deg gets to the gas water heat, it switches off and just let the hot water from the electric geyser to pass through.
  2. Like
    Most definitely you can do it. Will you get a CoC (electric and gas) for it, not sure. Will it blow up, probably only if you go from 0 to 75 degrees inlet water quickly.
    I don't have the manual, but check if there are high inlet temperature trips. Otherwise you must devise an electric cut-out for the gas heater if the electric geyser temperature is too high.
  3. Like
    ym8016 reacted to GreenFields in Solar panel question   
    If you're talking about the Growatt SPF 5000 ES, then I'd personally I'd look at the first string being 5 Megatron in series with 3 JA, and the second string being 5 Hyundai in series with 3 JA. But also, that's if you're satisfied to connect just 7.25kW of panels when the inverter(s) can handle more. Just a personal opinion, to be checked professionally.
    The disadvantage would be in that you cannot cannot effectively approach the maximum 6000W solar array that each inverter can handle, or efficiently upgrade after that, unless you use a different panel that's more closely matched to the 18A MPPT spec. In theory the additional 4 Megatron panels will mostly not quite cover charging the additional storage capacity.
    It's your call to check/say if it meets your needs; there's not enough info about your daily loads and off-grid/on-grid situation to form a proper opinion.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.