Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Devon D

Members
  • Joined

  • Last visited

  1. Devon D joined the community
  2. I'm hoping someone has had a similar experience and can point me to the problem. During load shedding this weekend, the backup system only lasted about 1.5 hours each time we were shed. Today I did a simulation. Switched the mains off. Batteries at full charge. Load was at 10% - 12%. Within 1 hour, the battery capacity had dropped to 80%. Then it dropped from 80% to cut-out in 15 minutes. Battery cut-out is set to 42V. Checked battery voltage after cut-out and they were all between 12.9V and 13.1V Setup: 1 x Axpert 5Kva Inverter 4 x 200AH Gel Batteries No Solar Installed December 2018 This set-up used to give me around 10 to 12 hours at +-10% load, and would easily last the 4.5 hours of load shedding. Is the problem with my batteries or inverter? Thanks in advance.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.