Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

InfiniPlus 10KW not syncing with the Grid. Warning code: 9

Featured Replies

We've been having rolling blackouts lately in Pakistan. Since last evening, the InfiniPlus 10KW inverter isn't going to Grid Mode (stays in Battery Mode), initially I thought it was grid frequency issue but after several hours, checked the inverter and it was flashing Warning code 9. 

From infini manual: warning 9 = Line phase loss = The phase of grid is not in right sequence.

Does the warning basically mean that line phases from the grid are not in correct order? Is this 100% a grid issue? My installer is saying to just have the electrician re-order the incoming phase wires and that will fix it, since we have no idea how long before the idiots at the utility realize phases are messed up.

Edited by LionKing

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.