Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

David Hird

Members
  • Joined

  • Last visited

Everything posted by David Hird

  1. Gents at Eskom you take the applicable line over from control center you then test the HV or LV line using an approved tester then you apply eqiupotential earthing at the work place.
  2. Hi,I have a 5kw Sun Synk inverter and 3,6 kw panels facing east and 3,6 kw facing north. From Nov-Feb I get >1000 Kwh/month.3,4,8,910th months 700Kwh-1000kwh. 5,6and 7th 500kwh-700kwh .I use 550-650kwh /month.My perception is that you are going to waste a lot of money .I agree with 2 batteries
  3. The above meter has a battery which ensures the set time of the meter is not affected by load shedding,this battery fails due to the frequency of load shedding .I experience this last year and my account did not look very good.Guys I suggest that you check your meter set time on a monthly basis.I live in Port Elizabeth ,I was not the only person who experienced the problem.
  4. Have you checked if you are not using munic/Eskom to top up?If so,how many kwh/month during the winter months
  5. Hi Tim,PE has changed their tariff structure as well .It is now +- in line with Cape Town. I was on a 3 kw inverter with 4.8kw panels and had to up grade to 5kw and 7.2 kw of panels due to winter accounts been a nightmare.I suggest you leave gridtie out of the equation. Solar in the day vattery at night.
  6. Morning Kory,been an ex Eskom official. I would source a 2nd hand Kwh meter and install it in series with the pay as you go meter to ensure that your munic meter is working correctly. This way you can compare the kwh readings.We had quite a few defective meters which had to be replaced
  7. Perfect thks I intend purchasing a 2nd battery to used on peak periods
  8. If the earth resistivity is high you will still have a problem
  9. It is ticked
  10. Yes,I am aware of that,I don't think that the power problems will be corrected in the next 5 -10 years so we ae safe for the time been
  11. Selling excess power is not an option at this stage in Port Elizabeth.8 months of the year I only pay admin fees of 160.00 in the winter months 2 x R1000.00 and 2 xR500.00 accounts .I have a solar geyer and gas hob
  12. Good morning,yes a very tender subject.I originally had,a 3kw grid tie inverter with 16 x310w panels .It worked very well, for 10 months of the year I had an account of R84.00 /month which was the admin fee.Port Elizabeth decided that they were losing money and changed the tariff which resulted in me having to upgrade to 7.2 kw panels and a 5kw inverter .Saving in winter R900.00,saving in summer R1850.00/month I am only using my battery for load shedding at this stage.
  13. I am allowed to export on to the munic system and I receive credits thks so far
  14. The connection to the general mass of earth in the most important aspect.You can install the best surge protection on the market but if you have a high resistance earth you will come 2nd best
  15. Get your installer/electrician to measure the resistance of the earth spike if I was you, I would start off there you can also increase the numbr of earth spikes DC and AC surge protection is a must.Ensure all earth connection points are corrosion free.
  16. Good morning,I have an approved gridtie installation.the CT is installed correctly.
  17. hi guys,it is great to be on a forum with people that supply a great amount of assistance.I am a retired ex Eskom official with 46 years distribution experience with a wire man's licence(don't shoot me pls).I have a 5 kw SunSynk inverter,7.2 kw of panels and a hubble 5 kw battery.I did my own installation with a bit of assistance from an installer. I may have a problem with the discharging of the battery up to 10 % while exporting to the munic I am on grid tie.Can someone pls supply some advice in layman's terms. I can supply my e mail and password so you can see the graphs
  18. Good evening,do you have surge protection on your supply side

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.