Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

riaanp34

Members
  • Joined

  • Last visited

  1. Thanks, software is the same. Do the dip switches in the two inverters need to change? And also in terms of the comms cables between the inverters is it from A to A or from A to B
  2. Hi, I have 2 x 12kw 3ph Deye inverters linked in parallel. I also have 3x Dyness 10.4kw powerwall batteries. When in parallel mode the inverters does not take power from the batteries, although the battery BMS is working and showing percentage available on both inverters but when I only run the master ( not in parallel mode) everything works fine. is there a setting I am missing?
  3. Hi, I have a Deye 12kw 3 phase inverter with 3 x Dyness Powerbox Pro 10.24 batteries. The dip switches on all batteries is correct in terms of master and slave and all green lights are on. When I change the settings on the inverter under battery settings to lithium, the inverter gives a F56 error. The comms cable is plugged in correctly in the inverter under BMS and on master battery on IN. If I change to use battery% or batter V it works. Anyone have an idea what the problem can be? I changed the comms cable but still same problem.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.