April 19, 20215 yr Hi All. I need assistance please. I have just installed 2 x 100ah Narada lithium batteries on a 5kw kings inverter (full circle Solar). How do I tell the inverter what battery type this is, currently it os set to AGM, and working fine. I do however believe I should set it differently. Setting it to Pylon sets off alarms. The other option I see is "user defined", but that means setting a lot of parameters in other menus, ehich I am.not sure off. Can someone please assist. JOHAN
April 19, 20215 yr Hi Johan I'm also using an Axpert King 5kVA inverter with 1 Narada 48NPFC100 battery for a year now. The inverter settings are set to the same values as some Pylons, believe both to be 15 cell batteries. I do however use a Raspberry PI with ICC to control the inverter according to the Narada's SOC, obtained through ICC, (back to grid & back to discharge settings are usauly set lower and higher as not to interfere with SOC setting inverter mode). Attached are the setting mostly used. As well as some correspondence regarding the Narada's communication protocol, by Hector from DARTCOM, The Narada importer. "Attached is the protocol for the battery, I am not sure if you will be able to use it. Voltronic, the manufacturer of the Axpert inverters, are busy doing integration and should be available soon. The settings that we have recommended for the Axpert are as below: Axpert Inverter settings Settings for the 48V100Ah lithium are Item No. Setting Value Program 02 Set to N*40A for 100ah Program 05 Set to USE Program 12 Set to 46V Program 13 Set to 49V Program 26 Set to 51.6V ( bulk) Program 27 Set to 51.5V (Float) Program 29 Set to 46V ( low V cut off) Hector King | Product Manager Power Switchboard: +27 (0) 12 345 7530 Extension: 7536 Fax: +27 (0) 12 3457600/1 Cell: +27 (0) 83 625 1985 E-mail: [email protected] Twenty One Industrial Estate 6 Padstone Street Sterkfontein Ext 9 Olifantsfontein 1666 " Hope this can be of help to anyone. SHINWA_PROTOCOL_V11 BMS.pdf
October 17, 20241 yr Knowledgeable discussion is going. Can anyone plz help me in setting the 12kw inverter with the 2V 600Ah narada lead acid 24 no of cells. (48V, 600Ah) I am installing it for the first time and facing issues regarding it's backup load. I have load of almost 9kw. On which my servers, labs, offices & classes are running. Kindly anyone help me in this matter. As soon as possible, what should be possible settings.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.