Ugrade advice, pairing of different sized Shoto SDC10-Box batteries
Did you go through with this? Did the devices work together?
-
-
rj4 started following Deye 6kw Off-Grid ATS240
-
Deye 6kw Off-Grid ATS240
Did you ever come right with this? How have the inverters performed for you?
-
solarpowershop.co.za
Sorry to hear. Did you try contact payfast about them? Have you checked what is actually at the address?
-
-
Is Sunsynk still an option?
The same question was asked on facebook yesterday. I only have a link for the group but look for the post: https://www.facebook.com/groups/1224829628388092 Basically the consensus I took away is: Great product - Failure rate seems high but only because of the volume they have sold and because of the slow support/repairs when there is a failure which results in more people being vocal which is fair
-
-
-
Low profile thermostat for geyserwise ptc element install
Thanks, I will look for this one. I have it at 10am. Think that's the only way the flange would fit in my geyser to be honest.
-
Low profile thermostat for geyserwise ptc element install
Does anyone have advice on low profile thermostat options for geyserwise ptc element installs that don't have the full geyserwise setup? I currently have a kwikot geyser and I've installed the ptc element, geyserwise flange and thermostat tube. The thermostat i have is the standard kwikot one that plugs into the standard spiral element, so there are terminals that are basically in the way of a flush fit into the thermostat tube. The main issue is I can't close the geysers plastic protective cover over the element and thermostat, so they are a bit exposed to the elements at the moment because my geyser is mounted outside. First prize is to get a thermostat that fits better. Alternatively, I'll have to make a custom cover to fit better.
-
-
Shoto SDC10-Box 5 (5.12kWH) 16 Cell, battery settings
The reset button is used to turn it on or off, hold it down for 3 seconds. You can download the manual from this very forum:
-
Grid-tied 5kw solar solution confusion
The 5kw load is just for dc to ac inverting. When you have access to the grid, your inverter can pass through a certain amount of ac current(Think its 35a) over and above the 5kw supplied/inverted from your solar/battery. When the grid isn't available, then you are limited to the 5kw from solar/batteries. My understanding was that there is overload protection so the inverter should protect itself when overloaded, but I havent tested so hopefully someone else can advise for that.
-
Astute CBI wifi timer/switch
Just taking a shot in the dark here: Any chance you are using a mikrotik router? https://cbi-lowvoltage.co.za/content/how-pair-astute-smart-device-mikrotik-router Im just wondering if maybe when you reset it that it cant connect to the network.