Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

George Major

Members
  • Joined

  • Last visited

  1. Thanks Chris should i and can I add more panels ? cheers george
  2. Thanks Pilotfish That makes sense , I will try the settings and let you know how I go. Generator is 18KVA. Cheers George
  3.    Chris Louw reacted to a post in a topic: bmv 702
  4. Thanks Chris , batteries are 1288 ah @20c yes 56,5 v was the battery voltage whilst the generator was still running this am. almost immediately after turning generator off the voltage dropped to 50,1v each Axpert is linked to 3 Strings of 3 panels of 255 watts each so 45 panels in total Set to charge at 10 amps per axpert off generator what should I use as bulk and float voltage ? cheers george
  5.    Mark reacted to a post in a topic: bmv 702
  6. Thank you all for the advice so far. I am moving forward , I have followed the setup as per video on the bmv702 as from paulF007, I have the pi working and the icc software running. But i do not think my batteries are charging up properly ? I measured them this morning with a hydrometer - picture attached. I ran on generator through last night and voltage was reading 56.5 as per viltron BMV702 pictures attached. 10 minutes off generator batteries reading 50,1 volt ? load was 1500 watts max. If i read the instructions that came with the rolls battery they suggest bulk charge at 60 v ? the axpert allows 58,4 v ? I have attached some pictures of settings and set up. Would be most grateful for any more suggestions ? cheers george
  7. George Major posted a topic in Accessories
    Hi I need some help setting up a BMV 702 , It will need to be a step by step guide for dummies? I have 5 x axpert 5kva inverters in parallel , 1 x string of 24 x 2 volt rolls lead acid batteries set up is off grid. I also have a raspberry pi that I'm trying to integrate? any settings / advice would be greatly appreciated. cheers george

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.