Everything posted by Peter Woest
-
Axpert firmware 72 70 C
To match 2 inverters to paralell. this is the newer firmware of the 2
-
Axpert firmware 72 70 C
Good day Please point me to the link for Axpert 72 70 C firmware. Thank you
-
Kodak 7.2 offgrid inverter exporting to grid
Im not sure if that is even possible?
-
Kodak 7.2 offgrid inverter exporting to grid
Yes we did
-
Kodak 7.2 offgrid inverter exporting to grid
100% correct. Being offgrid inverter, no matter the settings it should never export to grid.
-
Kodak 7.2 offgrid inverter exporting to grid
Hi This system 2x 7.2 in parallel has 2040w pv per inverter, This export happens when batteries are fully charged and zero load applied? What firmware version did you sort this with. Currently running 90.19 Thanx
-
Kodak 7.2 offgrid inverter exporting to grid
Anyone having this problem of the 7.2kw inverter exporting? Installed 6 this year and all doing same thing. Today tested a 2x 7.2 parallel system. 1.5kw export to grid when in SUB mode. Seems to be working fine in SBU mode. Tested also with a 100w lamp connected to AC input, Lamp lights up intermittently when grid is off. Flushed the firmware as per Segen with different firmware version. Same problem. Any advice appreciated. Thanx
-
Kodak King 5kw error 32
I did not notice the warning after 32 Attempting to flash to 71.86 main mcu to match the 2 existing units in a 3 parallel setup. 71.80 before flash. First attempt was done with usb stick method. reflash started and after about 10min stopped. After that when inv is switched on, countdown 5.4.3.2.1....32.with fan running. I dont have the option to re-do the stick method. all but power buttons are non responsive
-
Kodak King 5kw error 32
Please help Kodak king 5kw. Done firmware upgrade and inverter not starting up after. Only display 32 on screen?
-
Pylontech connected to 2 or more inverters
As far as I know Pylon bms limits 100A discharge even with 7 units connected with comms
-
Pylontech connected to 2 or more inverters
Thanks for your reply My understanding is even with a stack of 6 pylons, one is still limited to 100A battery discharge?
-
Pylontech connected to 2 or more inverters
For example kodak or mecer 5kw inverter.. 3 inverters in parallel 15kw. Roughly 60A max AC output. Will never reach 60A output with only 100A DC input available?
-
Pylontech connected to 2 or more inverters
Good day Connecting Pylon tech to 2 or more inverters(parallel or 3 phase) Do you connect each inverter to a separate Pylon battery or all inverters to one battery bank? Latter how do you deal with pylon 100a max output? Seems kinda useless having only 100a DC input on 15kw inverer setup?
-
Goodwe Hybrid tripping conlog bec44
Day 2 without any conlog trips, and a 160 watt lamp lighting up the garage during daytime..feels like a waste but it seems do do the trick. Thanx for your help
-
Goodwe Hybrid tripping conlog bec44
Thank you Chris The inverter came with the EZ meter,no clamp ct. This means I will connect the 150w load on the municipal supply side of the EZ meter? This way the conlog will see a constant load?
-
Goodwe Hybrid tripping conlog bec44
Please help. Have a Goodwe 4.6kw hybrid installed and recently had a conlog bec44 prepaid installed. The conlog disconnects on abnormal trip, suspect this happens when inverter "zero's" Inverter is set to 0% export