5KV Mecer/Axpert inverter shuts down on battery low
- Phocos Inverter and Pylontech Battery
Hello Would greatly appreciate understanding how you set-up your geysers "off-grid" indicated in your Spec below and how you managed to significantly lower your consumption: I have just installed the following: 5740 Kw PV Array + 5KW Phocos Inverter + 7Kwh Pylontech US3000 I have not connected my 200L geysers through Inverter (isolated the circuit, so powered direct from grid), though would be interested to know how the Geyser-wise functions and whether I could connect atleast 1 geyser through Inverter. Other High-powered loads I have are: Booster Pump, Borehole Pump, Lawn Mower, Iron, Microwave Kindly advise if your Inverter has Over-ride Timers to manage loads during the day. I.e My setting is SBU (Solar-Batt-Utility) Thanks Off-grid 7.56 kW PV array, 2x Synapse 5.0K+ 5KW 48v in parallel (aka Axpert KING) (FW 71.70) 01-SBU, 02-40A, 11-10A, 12-48v, 13-51v, 16-SLb/UCb, 26-53.2v, 27-53.2v, 29-45.5v EMS 48100a1 9.6kWh li-ion 100Ah 48v Huawei (was a nightmare), 14 kWh Pylontech US3000 (most times fully charged at 12:30) 2x 200 liter electrical geysers (2kW element) in series with geyser-wise, powered by solar from 8:45 - 14:15, Gas hob, oven bypassed to grid directly. monitoring still an issue (ICC with Pylontech cable), grid use down to +- 35kWh per week (from +-32kWh per day), some kinks to resolve, hope for 12kWh per week (6kWh for week ending 01-12-2019).- Phocos Inverter and Pylontech Battery
Hello Did you manage to get the correct communication cable between Pylon-Phocos?NNM joined the community- Phocos anygrid inverter with pylontech or dyness batteries
did the pinouts work out? Did you use the RS485 port to connect this new cable to your inverter BMS? What were your DIP switch settings on your pylontechs? - Phocos Inverter and Pylontech Battery
NNM
Members
-
Joined
-
Last visited