Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (â‹®) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

nam-hunt

Members
  • Joined

  • Last visited

Everything posted by nam-hunt

  1. +1 Same problem. I asked CFE but no response yet.
  2. I found my N-E Bond contactor not switching.... I found that no matter what the ATS 240 terminals had permanent 240V on.... no matter if the grid is on or off. Note: Islanding mode is selected. HMMM🤔
  3. I did that.... but it only work when it charge from Eishkom. It does not work with solar/mppt... it will charge to 100% and then discharge.
  4. is all running still running well 2 weeks later?
  5. Leshen, are you referring to this setup as per attached?
  6. Thanks Leshen, I am admittedly clueless why a changeover is needed. If 2 lines of L and N goes to the home DB (one the bi directional line and one the inv. to load output) and both lines go via 40 amp 2 pole breakers, I can isolate both lines with the breakers.
  7. To the guru members Yes or No, what wrong? See picture The ESS load output having a E/L inline should be joined after the E/L that is installed the home DB?
  8. Thanks for your reply, so why does the second box in the attached photo not have a EL?
  9. Good day Members, Challenge 1. Under what section should this question go? ( Inverter or general) Challenge2. When installing a "Deye/Sunsynk" Hybrid inverter in accordance to the local regulations and that of the manufacturer this get challenging as I see so many variations on the "AC protection DB box" between the inverter and the house DB. Some installers use a Earth Leakage "switch" in this AC Protection DB box and some dont. The manual show only a AC breaker. The AC feed to Inverter from the grid gets taken after a main switch from house DB before the earth leakage. (" Inverter fed from main DB, not through earth leakage.) Then the output of inverter through an earth leakage. Then surge protection SPD is required by the manufacturer for warranty. Is there a guru member that can share a "correctly" wired "AC protection DB box" between Deye/Sunsynk and mains DB with components like the SPD, EL and breakers? Thanks
  10. Bump on the thread.... did you get the CFE5100s sorted?
  11. Good day Members How much load current can the 8KW Sunsynk handle on the essential connection side? (It is said not to connects AC's on the essential connection because the rush in current is to high.) Thanks
  12. Sold Thank you
  13. nam-hunt posted a topic in Classifieds
    2x Hubble S120 at R4700 ea Never used in original boxes and I can show the May 2022 purchase invoice. The Batteries dont fit in the space I wanted them to fit in my mobile application. I am in Pretoria East Contact o8one 32one 4433 Thanks
  14. Many thanks for the heads up!

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.