I need info on 2x BSL 7 Kw installed in parallel.

Installed the second battery inserted comm cable between the two 485 ports as per documentation. Also set dip switches to master and secondary.

what should the status be of the run LED's? The one stays on and the other one blinks as it did when connected alone.

is this correct?

 

 

1 hour ago, Deon Zeelie said:

I need info on 2x BSL 7 Kw installed in parallel.

Installed the second battery inserted comm cable between the two 485 ports as per documentation. Also set dip switches to master and secondary.

what should the status be of the run LED's? The one stays on and the other one blinks as it did when connected alone.

is this correct?

 

The one that’s blinking is being charged while the one with the solid green is fully charged. They will eventually equalize. 