Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Spidergear

Members
  • Joined

  • Last visited

Reputation Activity

  1. Like
    Item: 2 x Hubble Lithium AM2 batteries and Cloudlink
    Age: Bought brand new on 10 September 2022
    Price: R40 000 for everything.
    Payment Method Accepted: Cash/EFT
    Warranty: Balance of 10-year warranty, 15-year design life for the battery cells.
    Packaging: No
    Condition: Excellent/Brand New
    Location: Randburg
    Reason: I got a bargain on some Pylontech batteries so I no longer need these.
    Shipping: Definitely not
    Collection: Yes
     
  2. Like
    Spidergear got a reaction from anthonyhugo in So the Victron journey has started...   
    Very nice! I really like my Victron setup.
     

  3. Like
    Spidergear got a reaction from Milan188 in Building new House Plan - DB Board Location   
    Whatever DB size was specified, make it bigger! This is the new DB I installed in the garage and I completely filled it up with the various breakers/changeover switches.
     

     

  4. Like
    Spidergear got a reaction from Peyper in So the Victron journey has started...   
    Very nice! I really like my Victron setup.
     

  5. Like
    Spidergear got a reaction from Antonio de Sa in So the Victron journey has started...   
    Very nice! I really like my Victron setup.
     

  6. Like
    Spidergear got a reaction from iiznh in Building new House Plan - DB Board Location   
    Whatever DB size was specified, make it bigger! This is the new DB I installed in the garage and I completely filled it up with the various breakers/changeover switches.
     

     

  7. Like
    Spidergear got a reaction from BigBear in My Victron Journey   
    Completed the assembly of the Renusol TS+ components and installed/wired the panels on Saturday/night. Will post a photo of the solar panels on the mounting hardware.
    Updated the firmware of the Smartsolar 450/100 and we were good to go.

     
    I ran out of sprag over the weekend so I still need to tidy up the cabling to the MPPT and the batteries. I also need to redo the DC cabling from the Inverters to the busbar as they are not all the same length and the inverter with the shortest cable is working the hardest.

     
    Here are the stats for today. Overall I'm very happy with the outcome.

     
  8. Like
    Spidergear got a reaction from GerhardPret in My Victron Journey   
    Mounted the third inverter last night and started with the wiring. 

     
    Wil be adding a separate earthing wire for the cases tonight.

     
    Started with the battery wiring as well. Couldn't find red cable so blue will have to do. Each inverter and solar controller battery wiring is 25mm. I will be running either a  single 75mm or 2 x 50mm cables from the busbars to the KETO disconnect. 

  9. Haha
    Spidergear got a reaction from GerhardPret in My Victron Journey   
    Finished making all the DC cables. I simply could not get the 75mm cable to fit in the top busbar enclosure so I resorted to 2 x 50mm. I have a severe disliking in working with anything over 6mm! 🤣


    Finally complete!

     
  10. Like
    Spidergear got a reaction from GerhardPret in My Victron Journey   
    The solar side is no where near completion but I wanted to get the inverter and batteries online so I can give the middle finger to loadshedding. 
    Connected all the inverters together with the cable I made, fired up the laptop and connected the MK3 interface to the VE.BUS port of the left inverter which will be the master, the other 2 will be slaves. The VE.Bus Quick Configure tool makes it very easy to setup a parallel or 3 phase system. They all have to be of the same type and firmware version. I had to update my master to the latest firmware and it was good to go.

     
    Did some basic config using VEConfig and BAM, we are online on VRM! Looking at these load figures I seriously need to pull my finger out and get the solar panels up and running. I'm keeping City Power afloat all by my self! 

     
  11. Like
    Spidergear got a reaction from GerhardPret in My Victron Journey   
    Completed the assembly of the Renusol TS+ components and installed/wired the panels on Saturday/night. Will post a photo of the solar panels on the mounting hardware.
    Updated the firmware of the Smartsolar 450/100 and we were good to go.

     
    I ran out of sprag over the weekend so I still need to tidy up the cabling to the MPPT and the batteries. I also need to redo the DC cabling from the Inverters to the busbar as they are not all the same length and the inverter with the shortest cable is working the hardest.

     
    Here are the stats for today. Overall I'm very happy with the outcome.

     
  12. Like
    Spidergear got a reaction from nam-hunt in My Victron Journey   
    Completed the assembly of the Renusol TS+ components and installed/wired the panels on Saturday/night. Will post a photo of the solar panels on the mounting hardware.
    Updated the firmware of the Smartsolar 450/100 and we were good to go.

     
    I ran out of sprag over the weekend so I still need to tidy up the cabling to the MPPT and the batteries. I also need to redo the DC cabling from the Inverters to the busbar as they are not all the same length and the inverter with the shortest cable is working the hardest.

     
    Here are the stats for today. Overall I'm very happy with the outcome.

     
  13. Like
    Spidergear got a reaction from mzezman in My Victron Journey   
    Completed the assembly of the Renusol TS+ components and installed/wired the panels on Saturday/night. Will post a photo of the solar panels on the mounting hardware.
    Updated the firmware of the Smartsolar 450/100 and we were good to go.

     
    I ran out of sprag over the weekend so I still need to tidy up the cabling to the MPPT and the batteries. I also need to redo the DC cabling from the Inverters to the busbar as they are not all the same length and the inverter with the shortest cable is working the hardest.

     
    Here are the stats for today. Overall I'm very happy with the outcome.

     
  14. Like
    Spidergear got a reaction from anthonyhugo in My Victron Journey   
    Completed the assembly of the Renusol TS+ components and installed/wired the panels on Saturday/night. Will post a photo of the solar panels on the mounting hardware.
    Updated the firmware of the Smartsolar 450/100 and we were good to go.

     
    I ran out of sprag over the weekend so I still need to tidy up the cabling to the MPPT and the batteries. I also need to redo the DC cabling from the Inverters to the busbar as they are not all the same length and the inverter with the shortest cable is working the hardest.

     
    Here are the stats for today. Overall I'm very happy with the outcome.

     
  15. Like
    Spidergear got a reaction from HiTech in My Victron Journey   
    Mounted the third inverter last night and started with the wiring. 

     
    Wil be adding a separate earthing wire for the cases tonight.

     
    Started with the battery wiring as well. Couldn't find red cable so blue will have to do. Each inverter and solar controller battery wiring is 25mm. I will be running either a  single 75mm or 2 x 50mm cables from the busbars to the KETO disconnect. 

  16. Like
    Spidergear got a reaction from HiTech in My Victron Journey   
    Wiring of the DB started. 

    Stated with the installation of the trunking. The OBO stuff from O-line is really nice to work with. Big thanks to @HiTech for pointing me in the right direction.
    Still have to the enclosures with the busbars, KETO disconnect and the bottom trunking for the batteries.

  17. Like
    Spidergear got a reaction from WannabeSolarSparky in My Victron Journey   
    Finished making all the DC cables. I simply could not get the 75mm cable to fit in the top busbar enclosure so I resorted to 2 x 50mm. I have a severe disliking in working with anything over 6mm! 🤣


    Finally complete!

     
  18. Like
    Spidergear got a reaction from WannabeSolarSparky in My Victron Journey   
    The solar side is no where near completion but I wanted to get the inverter and batteries online so I can give the middle finger to loadshedding. 
    Connected all the inverters together with the cable I made, fired up the laptop and connected the MK3 interface to the VE.BUS port of the left inverter which will be the master, the other 2 will be slaves. The VE.Bus Quick Configure tool makes it very easy to setup a parallel or 3 phase system. They all have to be of the same type and firmware version. I had to update my master to the latest firmware and it was good to go.

     
    Did some basic config using VEConfig and BAM, we are online on VRM! Looking at these load figures I seriously need to pull my finger out and get the solar panels up and running. I'm keeping City Power afloat all by my self! 

     
  19. Like
    Spidergear got a reaction from anthonyhugo in My Victron Journey   
    The solar side is no where near completion but I wanted to get the inverter and batteries online so I can give the middle finger to loadshedding. 
    Connected all the inverters together with the cable I made, fired up the laptop and connected the MK3 interface to the VE.BUS port of the left inverter which will be the master, the other 2 will be slaves. The VE.Bus Quick Configure tool makes it very easy to setup a parallel or 3 phase system. They all have to be of the same type and firmware version. I had to update my master to the latest firmware and it was good to go.

     
    Did some basic config using VEConfig and BAM, we are online on VRM! Looking at these load figures I seriously need to pull my finger out and get the solar panels up and running. I'm keeping City Power afloat all by my self! 

     
  20. Like
    Spidergear got a reaction from anthonyhugo in My Victron Journey   
    Finished making all the DC cables. I simply could not get the 75mm cable to fit in the top busbar enclosure so I resorted to 2 x 50mm. I have a severe disliking in working with anything over 6mm! 🤣


    Finally complete!

     
  21. Like
    Spidergear got a reaction from anthonyhugo in My Victron Journey   
    Mounted the third inverter last night and started with the wiring. 

     
    Wil be adding a separate earthing wire for the cases tonight.

     
    Started with the battery wiring as well. Couldn't find red cable so blue will have to do. Each inverter and solar controller battery wiring is 25mm. I will be running either a  single 75mm or 2 x 50mm cables from the busbars to the KETO disconnect. 

  22. Like
    Spidergear got a reaction from Jacques Ester in My Victron Journey   
    The solar side is no where near completion but I wanted to get the inverter and batteries online so I can give the middle finger to loadshedding. 
    Connected all the inverters together with the cable I made, fired up the laptop and connected the MK3 interface to the VE.BUS port of the left inverter which will be the master, the other 2 will be slaves. The VE.Bus Quick Configure tool makes it very easy to setup a parallel or 3 phase system. They all have to be of the same type and firmware version. I had to update my master to the latest firmware and it was good to go.

     
    Did some basic config using VEConfig and BAM, we are online on VRM! Looking at these load figures I seriously need to pull my finger out and get the solar panels up and running. I'm keeping City Power afloat all by my self! 

     
  23. Like
    Spidergear got a reaction from Davey in My Victron Journey   
    The solar side is no where near completion but I wanted to get the inverter and batteries online so I can give the middle finger to loadshedding. 
    Connected all the inverters together with the cable I made, fired up the laptop and connected the MK3 interface to the VE.BUS port of the left inverter which will be the master, the other 2 will be slaves. The VE.Bus Quick Configure tool makes it very easy to setup a parallel or 3 phase system. They all have to be of the same type and firmware version. I had to update my master to the latest firmware and it was good to go.

     
    Did some basic config using VEConfig and BAM, we are online on VRM! Looking at these load figures I seriously need to pull my finger out and get the solar panels up and running. I'm keeping City Power afloat all by my self! 

     
  24. Like
    Spidergear got a reaction from Jacques Ester in My Victron Journey   
    Finished making all the DC cables. I simply could not get the 75mm cable to fit in the top busbar enclosure so I resorted to 2 x 50mm. I have a severe disliking in working with anything over 6mm! 🤣


    Finally complete!

     
  25. Like
    Spidergear got a reaction from mzezman in My Victron Journey   
    Mounted the third inverter last night and started with the wiring. 

     
    Wil be adding a separate earthing wire for the cases tonight.

     
    Started with the battery wiring as well. Couldn't find red cable so blue will have to do. Each inverter and solar controller battery wiring is 25mm. I will be running either a  single 75mm or 2 x 50mm cables from the busbars to the KETO disconnect. 

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.