  1. There is some very poor advise above re batteries, I would also stay well away from Growatt inverters. We have a plus 10% failure rate on the Growatt units. For a 3ph solution I would recommend the Sunsynk or Deye 12kW units.
  2. Hi, We have had more than normal failures, however the importer has been brilliant with replacing units so far.
  3. Hi Guys, Has anyone ever seen this before? When connected the panels looks like this but the customer says it has returned to normal when disconnected. I still waiting for the panel to be returned. Bowsie
  4. Hi Guys What are the options out there for monitoring Axpert inverters? Is anyone using happily using anything? Regards
  5. Hi Chris, Hope you well. Ah, never noticed the spanner before. I have adjusted all the other programs, but 29 won't let me move up or down. Will have to have another go at it.
  6. Hi, I have a problem with a Axpert MKS 48V. Program 29 is not letting me adjust the battery cut off and has a little spanner next to it. I'm guessing it is another setting that is blocking it. Any Ideas?
  7. The C10 rating is 167ah Sent from my iPhone using Tapatalk
  8. Price is around R2800 Sent from my iPhone using Tapatalk
  9. Hi, A question more out of curiosity. Why is the internal wiring in a combiner box always Solar Cable and not just standard, equivalent 4,6,or 10mm2 normal copper cable? Is this due to regulation? Would using standard copper create a problem somehow? Bowsie
  10. Hi, I have 8 hoppecke 6v batteries installed in a 48v bank. Very happy, no problems as of yet. Is there anyone else out there using these batteries or does anyone have or had any experience or opinion on them? I have attached a spec sheet, any feedback appreciated. Bowsie sun_power_VRM_en (1).pdf
  11. I'm personally using Hoppecke 6v 200ah. I am interrelated in the forums opinions on the AGM vs Gel, pros and cons in an off grid situation. Sent from my iPhone using Tapatalk
  12. Sorry. Let me rephrase. Not economic batteries, rather on an economic system, so not top end equipment. Presuming the batteries are speced correctly and ventilation was not an issue and you had a choice over AGM or gel in an off grid application which would you chose? @Chris Hobson your AGM's have lasted two years. Is that cycling every day? Sent from my iPhone using Tapatalk
  13. Yes has a cover. At this stage not too worried about overheating, all the main vents are open. Will monitor it. Sent from my iPhone using Tapatalk
  14. Hi Guys. I'm looking for opinions on the best batteries to use on small economic off grid systems from 1-5 kw peak. Has anyone had experience with gel or AGM over a period of time? Bowsie Sent from my iPhone using Tapatalk
  15. Sent from my iPhone using Tapatalk
  16. Sorry just see your reply. Mustek stock them Sent from my iPhone using Tapatalk
  17. I found the quality on the AC DC change over wanting. The terminals strip and buckle Sent from my iPhone using Tapatalk
  18. @ibiza let me know if you win. I've ordered from a electrical supplier in Edenvale. Ferreras. Collecting today. Sent from my iPhone using Tapatalk
  19. No just from a local supplier to see what it's like.
  20. I've ordered a onesto change over to test Sent from my iPhone using Tapatalk
  21. Hager do a 2 pole single space breaker. I'm not sure about their change overs. Sent from my iPhone using Tapatalk
  22. And if it's an issue, some extra cable for the second string Sent from my iPhone using Tapatalk
  23. @pilotfish do you know if onesto do a DIN change over switch
  24. Can I ask another question. What would the pros and cons of the 2 MPPT's vs the one MPPT be? Sent from my iPhone using Tapatalk
×
×