Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Solar system Load for two different sites

Featured Replies

We bought a solar system sized at 100 kva with batteries and inverters at site 1 and there was a change in strategy and we urgently needed to use the System that we bought for Site 1 to be used at another site. The second site might have less power requirements than the first site. But the company we hired for the solar installation says it won't work

So I would like to find out is it true that dividing the electrical load into "essential loads" powered by a combination of generators and solar, and "non-essential loads" powered solely by generators, can potentially hinder the inverter's capacity to manage battery charge levels effectively, potentially posing a risk to our valuable equipment and appliances? 

Also is  it possible that the inverters are unable to control the generator's in such a setup?

On 2023/10/11 at 7:11 PM, Luschelle said:

We bought a solar system sized at 100 kva with batteries and inverters at site 1 and there was a change in strategy and we urgently needed to use the System that we bought for Site 1 to be used at another site. The second site might have less power requirements than the first site. But the company we hired for the solar installation says it won't work

So I would like to find out is it true that dividing the electrical load into "essential loads" powered by a combination of generators and solar, and "non-essential loads" powered solely by generators, can potentially hinder the inverter's capacity to manage battery charge levels effectively, potentially posing a risk to our valuable equipment and appliances? 

Also is  it possible that the inverters are unable to control the generator's in such a setup?

To answer your question in short without confusing you, the answer is absolutely YES. If site 1 needed 100kva and the new site needs less than that, you can definitely use the same system on site 2. If anyone tells you other wise, believe me, they just want to milk you. The highlighted part, is false, Things to consider when managing your battery charge is inverter settings or  BMS comms, size of your PV, battery bank size and your load which is powered from the inverter. If you want to charge from the generator, then you will need to chose the appropriate Geny. 

Get another installer to quote you and tell him what you have already bought. Solar equipment is normally plug and play and one can easily make it work to meet their requirements. I would say, without even asking you what you have already bought, that it will be possible to use the same equipment you bought to provide 100kva, to power a lesser load demand site. If anyone tells you otherwise, then they are after your money. Just run and never look back 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.