Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (โ‹ฎ) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Gooney Bird

Members
  • Joined

  • Last visited

  1.    Gooney Bird reacted to a post in a topic: Our dear friend @Taliab
  2. I am truly elated to hear that @TaliaB is healing and recovering well and also resting. God Bless you my friend and may he take special care of you during your recovery.๐Ÿ™ May he keep his hand of protection over you and your family during these trying times.
  3.    Gooney Bird reacted to a post in a topic: Our dear friend @Taliab
  4.    Teltech reacted to a post in a topic: Our dear friend @Taliab
  5.    zsde reacted to a post in a topic: Our dear friend @Taliab
  6. I am not on this forum very frequently and hence only yesterday by chance I had learnt of @TaliaB's medical condition and hospitalization after having tried to contact him about something completely different๐Ÿ˜ฅ I was also informed that by the Grace of God he is doing better now. My heart goes out to him and his wife, and I wish him a very speedy recovery to absolute excellent health in the future.๐Ÿ™ God Bless you @TaliaB
  7. I have a 5kw Sunsynk inverter with the following firmware, MCU:3382 and COMM: E426 which according to the list above from Morelz it is not the latest firmware update available. The latest firmware for a Sunsynk 5kw single phase inverter evidently being MCU:3388 and E440. After reading several posts including the post above I would like to know if it is at all necessary let alone wise to update the firmware of my inverter given the fact that there is nothing really that I am aware of that suggests I need to update the firmware. I most certainly do not want to experience any faults or issues that do not currently exist after having updated my current firmware with the latest firmware, however I am not opposed to the latest technological upgrades and fixes normally associated with updates of any kind provided they add positive value. Your thoughts please?
  8. I have the following unused new items for sale due to the fact that they were purchased for an intended application however afterwards I opted for a completely different solution hence they are still brand new an unused. APATOR RBK 00 Pro-M, Horizontal fuse switch disconnector which is brand new and unused DF NH00 Fuses 125A,500V, 120kA Price: R600 Located in Pretoria Condition is brand new in original packaging Purchased but no longer required for the intended application Shipping for buyer's account If interested, please contact me via personal message.
  9. Just to add to what TaliaB posted in terms of the flow chart and issues encountered with my solar system, he found that the CT Coil was showing corrupt data on the system's flow chart due to it being incorrectly installed by the Electrician responsible for completing my solar electrical installation and who ultimately was responsible for final commissioning of my solar system, this despite him having been given a clear diagram of how the CT coil wires were to be joined to the CAT6E cable and exactly how they were to be connected to the Inverter. What is also evident on the flow chart as pointed out by TaliaB where I pushed the essential load beyond 5kw momentarily resulting in the high wattage that was created momentarily was due to a communication problem with my wife as a result of her unknowingly switching the home kettle on whilst I unknowingly switched the geyser on as I was also testing the geyser at the same time that the kettle was boiling๐Ÿ˜Œ As discussed by TaliaB in his post there will be further enhancements to come such as replacing my 4kw geyser element to a 2kw geyser element and also installing the double pole relay to protect my soalr battery. There have been several issues that TaliaB has identified that had to be rectified in order for the system to be commissioned properly and for that I am eternally thankful. _________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ system is sorted. Minor problems eg. Incorrect CT polarity and mostly settings. Never underestimate the importance of installing the CT coil correctly on bi-directional inverters. As for the geyser and pool pump on essential side will be managed by installing a double pole relay downstream from the smart timer where geyser and pump will be disconnected during power outages and automatically reinstated when utility returns. Also swapping the 3kw geyser element out for a 2kw element. Before and after flow diagram from the inverter. Pushing the essential loads far beyond 5kw thanks to pass-through capability.
  10. I would really like to thank everyone for taking the time and making the effort replying and giving their input by posting on this thread as I genuinely have not felt so helpless in my entire life before. I have never really paid attention to anything that has anything remotely to do with electricity and hence I do not understand much about electricity related topics let alone complicated electricity issues such as solar systems. I am however now eager to learn and have now started to research everything about solar and electricity and hence all the input on this thread has been very rewarding and comforting for me to say the least. I would however like to take this opportunity to wholeheartedly thank one specific person on this forum who unselfishly contacted me and offered to assist and stand by me until my system was fully commissioned no matter what problems lay ahead. That Special Person needs no introduction on this forum and is none other than my friend Talia B who in my eyes is a genius and a remarkably Special Man with a Heart of Gold and a Wealth of invaluable experience and knowledge. I do not say these things lightly as he was able to commission my solar system , identify serious issues and avoid potential pitfalls, fix them, test them, change them, tweak them, trouble shoot them and eliminate them completely and then also continuously follow up on them to see that my solar system was commissioned properly, all this when this man was thousands of miles away outside of our country without even having the opportunity to personally touch or see anything with his own eyes and hands as he would normally have done if he was doing the work himself. He took it upon himself to help me through all of this although he was not at all able to be present to solve my issues personally, but he was determined to help me resolve these issues despite any challenges he may have come across remotely. With his guidance and expert tutoring skills he successfully commissioned my solar system remotely by coaching me to make the necessary changes required in order to achieve complete success and for this I have the greatest eternal respect for this Humble Giant of a Man.๐Ÿ‘ To TaliaB I thank you for not only your exceptional skills but also for your kind and gentle demeanour, your patience and respect for a human being in dire and desperate need of help, You made the world of difference to my life and for that I will always remember this and never forget what you did for me.๐Ÿ™ Thank You so much God Bless You๐Ÿ™
  11. Happy Easter to one and all Last night I visited my neighbour who has two Sunsynk 5kw inverters connected to two freedom won 5kwh batteries and I then photographed his settings and different screen menus on his inverter when I noticed some key settings being different to mine although his setup is different to mine as he has two inverters and two batteries where I have one. I am taking the liberty to post the current settings of my 5kw system that was "Started Up" Note I did not say "commissioned "as the Electrician that connected it has no clear idea of a Sunsynk system let alone solar. My situation is that my wife and myself live in a 3bedroom house and we both are home allt of the time as she works from home hence the need for this 5kw solar system in times of loadshedding. I have a CBI astute geyser smart timer connected to my 200l Kwikot Megaflow Geyser and I have a 19000L swimming pool with a 0.75kW Speck pump and motor. My electricity usage is between 450 and 500kWh per month.(Solar has only been connected for 4 days now so nothing to share in terms of any savings or efficiencies) I would like to use the sun to power most of our daily Electricity usage in order to SAVE Electricity costs but also have a system that is ready to go when loadshedding hits. The current configuration is that my geyser is connected to essentials and my stove to non -essentials which is the way I understand it.(Reason being that the initial installer that never bothered to return to complete the installation was adamant the geyser should be on essentials as there is a timer and the geyser will be used sparingly and responsibly). I am not so sure about my current settings being optimal nor correct, especially in my system mode and hence I would appreciate some solid feedback in order to correctly programme my Solar system if need be. Any constructive feedback will be highly appreciated. and therefore I humbly thank you in advance.๐Ÿ™
  12. You don't understand the level of bad luck I have experienced in the last couple of years so therefore I would not dare attempt to do anything myself despite the fact that I would love to DIY. If it wasn't for bad luck I would not have any luck at all๐Ÿ˜ข
  13. I am in need of a professional with expert knowledge of a Sunsynk 5kw Hybrid Inverter, 5.32kwh Sunsynk battery with 10 x 460W JA solar panels. I reside in the east of Pretoria and require the services of someone with exceptional Sunsynk systems knowledge and sound commissioning skills that would setup my system optimally and professionally and show me the in and outs of my system. No mounting of any hardware nor electrical work or solar installation is required. If you are able to assist me here please send me a personal message as soon as possible.
  14.    james naidoo reacted to a post in a topic: Is this correct and lawful
  15.    james naidoo reacted to a post in a topic: Is this correct and lawful
  16.    james naidoo reacted to a post in a topic: Is this correct and lawful
  17.    Derek3 reacted to a post in a topic: Is this correct and lawful
  18. Hi Steve It is indeed sad to see the atrocious workmanship of some individuals as all they are interested in is their own wellbeing and not the client's, All is not lost though and I have to make a bad situation good again hence I need some correct answers and advice before the final commissioning of this system. Maybe I could contact you and check with you what can be done and what I should look out for next and what possibly needs to change or be re-done if need be? It will also serve me better to know what is required by law? Could I perhaps contact you via pm or alternative means?
  19. Hi Shockit I am not sure what you mean At some point the PV cables are in a conduit leading up to the roof where the solar panels are affixed. The pv cables are also routed in sprag tubing at certain points. Please elaborate and give me the correct way and what you exactly mean and why plastic conduit is a problem?
  20. As I said I was assisting a family member during her installation as she does not have the knowledge to know what is correct and what not.
  21.    Jacques Ester reacted to a post in a topic: Is this correct and lawful
  22. A family member had an installation done during last week which in my mind leaves me with many questions and uncertainty hence I would appreciate some advice as this family member is by no means knowledgeable when it comes to the rights and wrongs and legal implications of this solar installation. Herholdts was contacted whereby a Master Installer was highly recommended by the salesperson whereby a site inspection was later done by this installer. A quotation for a Sunsynk 5kw inverter together with a Sunsynk 5.32 Kwh battery and 10xJA 460w solar panels was decided upon whereby a huge deposit was promptly paid to the installer. Lat week, almost two months since the deposit was paid the installer arrived and did the installation although not completing or commissioning the solar system due to challenges with the location of the system opposed to what was initially discussed and agreed upon. The installer had agreed upon to return in order to commission the system in the future when a power cable is accessible at the point of installation. As for now the system is installed together with the solar panels but as yet has not been switched on due to the main DB being at a different position thereby creating a challenge for the owner to ensure that a power cable is supplied to the point of the installation. Prior to the installer leaving the site I was able to question him on several issues as well as on certain concerns I have. The following are some of my concerns The installation is relatively neat however during the installation several unsettling things were noticed. -The earth and neutral were bridged together with an green earth wire and when questioned I was told that it is the correct way as he does not use any other method including relays or earth neutral bond box. -Prior to the installer leaving there were several items that I collected from the floor of the battery and inverter although I could not check in the boxes myself as they were removed.(See attached Photographs) -I did notice the yellow comms cable as well as the box which I believe is the CT coil and then another clear wire with a metal probe at the end which resembles some kind of temperature probe, all of which were never removed from this packaging at all. When I asked the installer about the CT coil he replied that he does not use it due to it causing the inverter to make a noise and causes distortions. As for the comms cable he said that he makes up and uses his own comms cable which incidentally I had noticed during the installation was eventually routed together with another cable in the same sprag tubing and trunking due to the trunking already having been installed against the wall and hence omitting the hole being drilled for comms cable to be installed separately. As for the clear wire in the photograph I did not have the opportunity to ask why it was not installed too as I only discovered it lying on the floor after they had left. I also found several rawl-bolts still in their packaging that was supplied with the inverter and the battery and were never used in the installation, instead white plastic nail in anchors were used to secure the inverter and the battery as well as the DC and AC electrical combiner boxes along with the trunking against the wall which I personally would not have done if I was installing anything as heavy. My main concern thus far was the fact that when I questioned the installer about who would be signing off my Electrical COC that will be supplied to me upon completion of my installation, he remarked that he would be issuing the COC to me with a friend's approval and signature who is a qualified and registered electrician. I then questioned him if his friend would be present and visit the site of the installation prior to completion and final sign off and handover of the system whereby the owner and installer stated that he would be taking photographs of the installation and would be showing his qualified friend to sign off and approve the work done during the installation. I also have a major concern in that I personally witnessed 5 different people working on different electrical switchgear, wiring, panels and electrical equipment including the main DB Board during this installation, this despite all of them are said to be competent however according to my knowledge and subsequent questions and investigations not one of them is legally qualified as an installation electrician nor in possession of the necessary legally accepted qualifications required by the relevant Government Department or the ECB despite being adamant and confident that they are able to do the work competently and legally. I am not trying to get rid of the installer as he was given the job after all however several red flags are showing up and it seems that certain shortcuts have been taken and what was promised is in fact not materialising as expected. As mentioned, the system has not at all been commissioned yet due to changes suggested at the last minute by the installer which has led to us having to make additional provision for an alternative extended power source (AC Power Cable) than initially anticipated and planned for and now having to furthermore prepare for the supply of the extended AC cable to the point of the installation. I would also like to know what size/diameter AC cable would be necessary in order for the 5kw inverter and system currently being installed but it must also be sufficient and correct for future upgrades to a 8kw inverter and system if and when required in future. I know this is a long-winded message with my concerns I have but I would sincerely appreciate constructive feedback and advice on what to do and how to do it 100% correctly and legally as it is not too late yet. I would like to hear what the experts have to share and hence you are also welcome to send me a PM if you would like to comment offline.
  23. I am about to pull the trigger on a 5kw system as my intention is to install a Sunsynk Powerlynk 5kw Inverter/battery all in one system opposed to getting a Sunsynk 5kw inverter and Sunsynk 5.32kwh battery installed separately although the latter option costs 12k more for the same size system. I would like to know if the Sunsynk Powerlynk 5 kw system does make a noise as I notice from the pics that it has fans to probably keep it cool? This would definitely be a deal breaker as I intend installing it in my dining room area which is close to where my wife's office is as she works from home. Can anyone that owns such a system or any installer with firsthand experience or information on the Sunsynk Powerlynk 5kw system advise on the topic urgently please? I anxiously await your response in anticipation ๐Ÿ™ Thank You
  24. I am about to pull the trigger on a 5kw system as my intention is to install a Sunsynk Powerlynk 5kw Inverter/battery all in one system opposed to getting a Sunsynk 5kw inverter and Sunsynk 5.32kwh battery installed separately although the latter option costs 12k more for the same size system. I would like to know if the Sunsynk Powerlynk 5 kw system does make a noise as I notice from the pics that it has fans to probably keep it cool? This would definitely be a deal breaker as I intend installing it in my dining room area which is close to where my wife's office is as she works from home. Can anyone that owns such a system or any installer with firsthand experience or information on the Sunsynk Powerlynk 5kw system advise on the topic urgently please? I anxiously await your response in anticipation ๐Ÿ™ Thank You

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.