Everything posted by d3nominat0r
-
Hubble Lithium Battery AM-2 5.5kWh
Is it possible for someone to share a link for PBMS Tools 2.5?
-
Averge 48100S 4.8KWH vs Hubble AM-2 5.5KWH
Hi everyone, I'm currently looking at these two batteries and trying to figure out which one to get. There is about a R4000 saving on the Averge compared to the Hubble with 700WH less storage. Other than looking at only the energy storage, they are both rated at 1C discharge, not that I plan to get anywhere close to that. I might be getting 2 batteries in anycase so that point is mute to me to some extend. What else should I be considering? Warranty looks similar, life expectancy more or less the same. Looking forward to your thoughts on both. Thanks
-
Grid-Tied SSEG Registration COCT (ECSA Pr. Eng Needed)
Hi all, Searched for references on the forum, but could not find any. I'm a graduated electronic and electrical engineer but never bothered to register professionally with ECSA since I ended up working in telecoms and software development for the past 15 years but have applied my trade as a hobby over the years. I'm planning to do my own PV installation with Hybrid Inverter and Battery backup, have a sparky friend that will assist with install, testing and provide a CoC. I'm looking for someone that is ECSA registered that can assist in Bellville, Western Cape. I need to do the EG registration with CoCT and then the SSEG registration post commissioning. Is there perhaps someone ECSA on the forum in my area that can partner with me on this install? Thanks
-
"Splitting" DB's
Just want to double check this. Not sure about what SANS says, but should each row in a DB have not have a master isolator? My understanding is it is fine splitting between rows, but not within a row. I would add a surface mount 2 or 3 row DB board on top of existing cavity. Can someone please correct me if this is wrong.
-
How to approach / request an electrician to install a solution
Glad to hear it is possible, looking for someone like that in Cape Town/Bellville area.
-
Advice for a stranded solar customer
@Glenn have you managed to get this sorted? I’m also looking for someone to assist with a CoC and CoCT SSEG registration in Bellville/Cape Town.
-
Basic Hybrid Inverter Wiring Diagram
I would also appreciate if someone can provided an updated wiring diagram.
-
Sunsynk 5kw Inverter and 2 x MPPT
Wanted to check, do you use the Vmp of Voc rating of the panels to calculate towards the startup mppt voltage?
-
Sunsynk 5kw Inverter and 2 x MPPT
@Nexuss Thanks, if the two strings of 4 are NE and NW respectively, so not spot on N and E, is having all 8 on a single string another option?
-
Sunsynk 5kw Inverter and 2 x MPPT
Hi there, Need to help to figure out of this will work. I'm planning to put up a Sunsynk 5kw Inverter and make use of both MPPT's. I have limited roof space, so can only fit 4 Panels North and then 4 Panels East. I'm looking at the getting JA 450W panels for my installation. I'm concerned about the MPPT start up voltage on the inverter, will 4 panels per MPPT work? Or should I try to fit 5 panels (might not be possible) or rather put everything on a single string? As for specifications, do I need to look at the Voc or Vmp figures on the panel data sheets as a start? The inverter looks like 150V per MPPT. Any advice would be appreciated. Thanks.
-
Small low pressure solar geyser
@PaulF007 Just checking in, are you still happy with "The Sun Pays" unit? Did you get the low pressure one? Is the Low Pressure one still rated at 400KPA?
-
DB Board Rewiring
@CarlT thanks, would be nice to get two additional busbar modules for the other two rows, one if definitively not enough.
-
DB Board Rewiring
Thanks, seems you don't have any changeover switches? Therefor no way to bypass inverter and switch out its loads if needed.
-
Partial Shade over Solar String
Hi all, I'm trying to find out what the impact would be on the MPPT and/or Inverter if you have partial shade sometime during the day on some of the solar array? Is the entire string's generation forfeited? The reason I am asking is that although I don't see big palm tree shade currently on my intended north facing roof, I'm sure there will be some at some time during the year. It it better to have multiple MPPT's to negate this if it is an issue? And perhaps add some east and west panels as well? Thanks
-
DB Board Rewiring
Seem there is a bigger one as well VS418TF, but it's not available at EM. This attached PDF outlines the accessories, but I don't see the additional busbars being listed?? Golf Enclosures.pdf
-
DB Board Rewiring
Also keen on getting one, what busbars get included?
-
DB Board Rewiring
Deleted double post
-
DB Board Rewiring
@Mstott just checking your board layout again, would you mind summarising what is happening on each row?
-
3-Phase DB Board Rewiring in Prep for Solar Installation
What would you say is the best pragmatic way of tracing the live/neutral pairs? Pure testing for continuity might not work due to loaded/unloaded circuits.
-
3-Phase DB Board Rewiring in Prep for Solar Installation
Got it, thanks @Johandup. Just want to check on the main supply side, I currently have a 3P Isolator and 3P CB, which I copied from the existing board. In my mind the 3P CB is not required as I am adding a Earth Leakage unit to each phase which was is not there in the 2/3 of the phases as they had no plug circuits. Can I remove the 3P CB?
-
3-Phase DB Board Rewiring in Prep for Solar Installation
Just to double check, I have a 25A CB for the Inverter before the changeover switch and then there is an Earth Leakage Unit. I will be adding an 2P Isolator on the Inverter Sub-DB. Not sure if this meets the requirement?
-
3-Phase DB Board Rewiring in Prep for Solar Installation
Interesting, I thought all phases share the same neutral. Why is this?
-
3-Phase DB Board Rewiring in Prep for Solar Installation
Thanks, I was thinking of doing the following. Does it make sense? I added the CG Energy Meter into the board as well to feedback to the non-essential loads in case of excess PV. This is a 3 x 18 (54 slots) DB Board.
-
3-Phase DB Board Rewiring in Prep for Solar Installation
@NigelL I just have a question regarding the termination of the 2 unused phases in your DB Board. Mostly the incoming feeds come through a single 3P Isolator and 3P Breaker that are single throw switches. Do you leave them just unwired post the 3P breaker although they are active?
-
3-Phase DB Board Rewiring in Prep for Solar Installation
@NigelL Thanks, makes a lot of sense and would simplify my installation considerable and reduce cost. Going to have a stab at putting everything on a single phase, calculating the load. I get the added benefit as mentioned with the the CG Meter to feed back to the non-essential loads if there is access PV during the day which would result in more cost saving.