Everything posted by PeanuTG
-
BSL Battery and comms
Apologies. I have not logged in here for a while. Yes, the Solar Assistant works with the VMIII. Set it as PYL in setting 05. And connect the BL3.6 to the Pi using a USB RS-232 cable. You can order it from Solar Assistant. Order the cable for the Revov R100. They use the same cable.
-
BSL Battery and comms
Thx, going to give this a try.
-
BSL Battery and comms
Morning I figured out that the Greenrich is the same as the Kodak. I will need to find out what the pinouts are for the RS232 and RS485 ports so I connect my Solar-Assistant Pi directly to the battery to read the BMS info.
-
BSL Battery and comms
is the BSL the same as the Kodak BL battery. They look exactly the same? Or even the Greenrich battery?
-
For Sale: 4 * 2.4Kw US2000 Plus Pylontech batteries with Mecer/Axpert 4000W Inverter
Is this sold yet?
-
Hoymiles Technical Advice required
What did you do in the end to get it working?
-
PV issue help pls
I agree. 4S will get close to 200V (Depending on what panels are used of course)
-
Application to Eskom for grid tie systems
I have the same question, but related to small 5kw to 10Kw residential systems that is Grid tied. Specifically in the Gauteng area.
-
Hoymiles Technical Advice required
-
Hoymiles Technical Advice required
- Mecer Axpert MKS II 5KW 48V 4000W MPPT - Minimum Panels required
Thanks for the replies everyone. I have 72 cell panels. I will connect all 4 panels in series and see what the outcome is.- Mecer Axpert MKS II 5KW 48V 4000W MPPT - Minimum Panels required
Hi I just bought this inverter. I see that the DC PV operating voltage is 120VDC. What is the minimum number of panels required to get the solar side working? I currently have 4 x 330watt panels. Reference: MUS-SOL-I-AX-5NB Condition: New product Rated Power 5000VA / 5000W Maximum PV Array Power 4500W MPPT Range @ Operating Voltage 120VDC~430VDC Maximum PV Array Open Circuit Voltage 450VDC Maximum Solar Charge Current 80A Maximum AC Charge Current 80A Maximum Charge Current 80A- Hoymiles Technical Advice required
Hi I want to start building a system using these Micro inverters. What is the minimum to start with? Note that LTE access on the farm is non existent. So I would have to get a monitoring unit that can send data via the cellular network. I have 3 phase power. Can I install the first unit on the first phase and then add to the other two later on? - Mecer Axpert MKS II 5KW 48V 4000W MPPT - Minimum Panels required