Sunsynk 8kw new installation
Just installed a Sunsynk 8kw inverter DIY and want to share some info. We use about 1000kwh (units) per month in our house so about 33 per day with about half in the day and half after PV hours. This is about average for a family home I recon in SA. Already have 2 Solar geysers, gas plates and all lights LED. I wanted to be independent from the grid as much as possible which weighed heavier than economics although my return is still acceptable and higher after tax than any risk free investment. The whole house runs through the inverter including oven, the solar geyser AC elements, all plugs etc. Only the 4 Aircons is supplied before the inverter but with the Sunsynk CT which fit over the supply line the inverter will push electricity to them too if sufficient PV and battery power are available. I have one normal plug before inverter for if I have to weld or use heavy machinery. I Installed: Sunsynk 8kw Brilliant inverter easy to do DIY and with help from Powerforum posts. Jinko Mono Cheetah 400w panels * 18 - Connected in 2 series - 9 each. 9 panels in series match perfectly, max voltage around 410V real life in October (Sunsynk specs max 450V) and producing 97% of rated panel watts (3500w per string) max. Fitted on aluminium rails on tile roof. Fitting the brackets under tiles is quite a job got my son to do that. 6mm PV cable running in PVC conduit from panels to inverter. One set is facing West and the other facing North. I think if you can get East and west facing panels that is ideal, as you need PV power early in the morning to charge low batteries and then you want to produce as late as possible in the afternoon to have full batteries going into evening. Although not the ideal orientation PV panels are cheaper than additional batteries. Pylontech US3000 * 5 These batteries when 100% charged at 5pm run the whole house through the night (have about 20 outside lights 3 pc's etc) and start to charge at 6am from west panels on around 30% SOC in October. By 11:30 am the batteries are normally 100% charged, then I boost the geysers through Geyserwise on free electricity to increase their temperature so that they are still warm in the morning. PV protection DB with fuses, surge arrestors and DC isolators. Fuse and isolator between Batteries and Inverter Grounding ROD and all earth wiring. AC CB and change over switch etc in AC DB with relay for earth neutral bond Total cost about R 210 000 (ex own labour) except for heavy overcast days I am not using any power from Tshwane, bill was about R1800-R2000 per month. The feeling when the kettle and iron etc are on during the day and you know that it is not costing you anything (yes i know it is kinda) is priceless.
-
Sunsynk 8kw setting time zone
Found the solution, had to log in and out of Solarman app.
-
Sunsynk 8kw setting time zone
Just installed a 8kw Sunsynk (brilliant inverter) and set the correct time on the display but if "Sync time" is checked it keeps on changing the time to UCT+3:00. On my SolarmanPro app (plant info plant profile edit) the time zone of inverter is set to UCT+2:00 but on the lower corner (on PC) the time is still shown as UCT+3:00. See pics attached. Can someone tell me where to change the time zone pls? Don't know if it is a Sunsynk or Solarman issue.
-
SunSynk 8kW mpp voltage
Ooh so 18A PER mppt,didnt know that thanx.
-
SunSynk 8kW mpp voltage
-
SunSynk 8kW mpp voltage
I have a 8kw Sunsynk and has not experienced clipping yet, I have seen readings as high as 11.5A on single mppt. I have 18 * 400w mono Jinko Cheetahs panels, split 9 on each mppt which in theory should only produce 7200w in total but have attained 7600w max so far.
-
software for sunsynk + pylontech combo
Ok I am going to say it, this is VERY impressive. Hat off to your technical abilities Boubul. Now if one of you can package this in a consumer friendly way which us non-geeks can understand and use it will be great. Willing to compensate.
-
Any recommendations for someone to make up DC wires in Pretoria?
If someone is still looking for a place to make up battery cables after many calls I found Sinetech in Jhb (could not find anybody in Pta) charge just over R100 /m for 50mm battery cable and R16 a lug, crimp while you wait. https://sinetechstore.co.za/product-category/accessories/solar-cable/
-
Schneider Solar installation experts?
The Schneider Inverter has a Control Panel which shows total load and power imported or exported to the Grid. Attached also a graph of elec usage of Yesterday from the Tshwane Prepaid Smart meter.My monthly usage is still about 270 units which is about 50% of my total usage.
-
Schneider Solar installation experts?
My inverter is still using some power from the grid even when the batteries are fully charged. It's a 7kw inverter and my usage will be 3kw then it will draw 800w from the grid. I have set Load Shaving On at 0A and Sell to grid on at 0A etc etc on the Schneider but still.
-
Schneider Solar installation experts?
Photo was taken at about 8 am so shade never covers panels during day, even in winter, I made sure of that. 4 strings, 3 in series. Did the installation myself.
-
Schneider Solar installation experts?
I have the following system installed: Schneider XW+7048 Inverter Charge Controller MPPT 60 150 12 * 310w Renesola Solar panels 24 * Willard RT17 560ah flooded 2V batteries SCP I require anyone with Schneider expertise that can check my installation, I want to make sure everything is done correctly. (Off course I will pay) Pretoria East area