Evaporative cooler
Hi guys I have an old cold room on my plot and I would like to know how to operate it. On top is perforated pipes where the water goes. And on top it has a whirly bird. What puzzles me it has 2x 80 mm pipes that runs from the roof into the wall of the room could this be for ventilation as I think it will pull warm air from outside into the bottom of the room where cold air should be? Only got it down to 21 today outside 30 and humidity 28. Sent from my SM-G800F using Tapatalk
-
-
Imeon 3.6 Failures
Same thing here in Namibia. Only know og one imeon/in gateau installed. And it fails to grid fees every day. Client is not happy as he had the option to install 2 Infini plus due to sales poeple went for the more expensive option. Probably going to change out the inverter for the Infini if things goes on like this. It's been 6 weeks and still not even France can sort out the problem. So ja go with the Infini and if it fails wich I have not seen once out of 38 installations in the last 2 years you get a new one. Sent from my SM-G800F using Tapatalk
-
-
-
-
Sunday installation
Gnome seems to be doing fine. Just sometimes the anti gravity generator of the bateries seems to have a problem. Lol. Sent from my SM-G800F using Tapatalk
-
Sunday installation
Thank you jakes. It was taken with a UAV. Maybe one day I'll go to site with my own chopper. ???? Sent from my SM-G800F using Tapatalk
-
-
-
Sunday installation
We did this installation on sunday. Installation took 6 hours from start to finish. About 120 km west of Windhoek on a very nice farm. System consists of Axpert 5 K inverter 8 x 260 Watt poly panels 4 x 200 ah lead crystal batteries Aluminium mounting system 100 A DC battery fuse Ready board Client runs a cold room of the system and does some washing and even ironing during the day. Had to go for such a big inverter to handle the starting amps of the cold room compressor. About 38 Amps for a second.\ I love these Axperts and Lead crystals working together.
-
7.2 kwp hybrid installation
Hi wetkit. Outputs each on own earth leakage unit feeding their circuits (took some rewiring as it's an old house and some neutrals were messed up) Inputs just running parallel and grid feeding. Tree gives minimal shadow in winter only till about 10 am. Owner wants to trim tree a little of the top for the next winter. System currently producing 42 kwh per day will increase gradually as summer comes around. Sent from my SM-G800F using Tapatalk
-
7.2 kwp hybrid installation
Thank you ibiza. Will upload some more installs if I can figure out how post easier. Sent from my SM-G800F using Tapatalk
-
7.2 kwp hybrid installation
System consists of 48x TSMC 150 W panels 8 x 200 ah lead crystal bateries 2 banks connected in parrallel 48 V 2 x infinsolar 3 kw plus inverters Batteries is set as back up only at the moment. Runs all lights office, entertainment and bedroom socket outlets. Installation time 2.5 days.