-
Connecting Pylontech 3000 to Luxpower SNA 5000
Can someone please help. I am trying to connect 3 x Pylontech U3000 to Luxpower SNA Inverter. It is the old Pylontech without the C marked. If still have the console port. If trying to connect to Luxpower via Can-bus (protocol 2) then the battery SOC stays permanently on 100%. The SOC does not decrease as battery is depleting. RS485 port also does not work? Does anyone have experience connect Luxpower SNA with Pylontech U3000, and can help me to setup
-
-
LuxPower Green Function (setting 20)
Can anyone please explain what the setting 20 (green function) of the LuxPower programming What is the meaning of this setting
-
-
Can solar cables and ac cables run in same condute or ducting?
Thank you for the reply. Can you perhaps elaborate on the type of problems (school fees) you experienced by running the cables together. Almost all photos I have ever seen on installations. There is only one set of trunking. So most installations today run ac and dc cabeling together in same trunking, for at least some portion of the cabeling. What would you suggest would be acceptable (if any) lenght to run ac and dc together. Specially the portion at the between battery and Inverter is sometime unavoidable to run in seperate trunking.
-
Can solar cables and ac cables run in same condute or ducting?
Can anyone advise if solar cables and ac cables can run in same condute or ducting. I was always under impression that ac and dc must be seperated, but is that still the case with todays quality of insulation on cables. If this is a topic that was been discussed already in other threads, then please direct me to those threads.
-
Axpert MKS 5KVA Inverter - 48V
Can anyone recommend a good repair center where I can take a 4Kw Axpert Inverter for repairs. The Inverter just started to do continues resets when input power is connected, and if I disconnect all power from inverter (input and output), and only have battery power connected to inverter (although battery is fully charged), then the inverter switch off completely.
-
Lightning damaged Axpert 4kW
Can anyone recommend a good repair center where I can take a 4Kw Axpert Inverter for repairs. The Inverter just started to do continues resets when input power is connected, and if I disconnect all power from inverter (input and output), and only have battery power connected to inverter (although battery is fully charged), then the inverter switch off completely.
-
My New Project on the West Coast in Yzerfontein
If I have a 3 phase application, and I am interested in the SMA Sunny Tri-Power 2000TL. Any one tell me, do I need 3 of these Inverter (one per phase), or do I only need one Inverter (i.e does the Tripower have 3 phase output.
-
Power Demand falls out of Peak sun hours.hmm
I have manged to get the following extract from the installation manual of the Sunny Home Manager. "The grid operator may demand the permanent limitation of the active power feed-in for your PV plant, this means limiting the active power fed into the utility grid to a fixed value or a percentage of the installed nominal plant power. If need be, ask your grid operator whether a permanent limitation of the active power feed-in is necessary and whether you are allowed to use the Sunny Home Manager for this purpose. The Sunny Home Manager monitors the active power being fed into the utility grid via a feed-in meter. If the active power feed-in exceeds the prescribed limit, the Sunny Home Manager limits inverter PV generation via Bluetooth or Speedwire". This answers my question on limiting the Sunny Boy to feed back into the Grid. But my next question is if the Load demands for example 5 Kwatt, but the solar power can only provide 2 Kwatt (due to low radiation and cloudy day), will be Sunny Boy (or Sunny Home Manager), then automatically provide the additional 3 Kwatt from the grid to supply the 5 Kwatt to the load?
-
Power Demand falls out of Peak sun hours.hmm
If I understand you correctly? I would need a Sunny Island, and if the load demands more power than the solar can supply via the Sunny boy, then the Sunny Island will provide power from the battery and the grid if necessary to supply the load (during high load demands) ?
-
Power Demand falls out of Peak sun hours.hmm
Can you please tell me if the Sunny Boy can also be configured as a "hybrid" inverter. My scenario is a follow. I stay in JHB (were grid tried is not an option yet) and I do not want to run the risk of doing "anything illegal" such as reversing the meter when the municipality does not allow it. So my question is ... can the Sunny Boy be configured not to feed into the Grid, but still switch to Grid to supply my load if the Solar is not enough (during cloudy days) to carry the load.
-
-
-
Axpert MKS 5KVA Inverter - 48V
Hi Wetkit. Thank you for your reply. I have already agreed in one of my previous posts that I must split up the solar panels per inverter will do that soonest. As far as the rest of the discussion is concern about the if I need to get more solar panels (or another inverter) ...... If it looks like I am confused, then I must admit I am confused. Some of the previous people that posted comments say that the Inverter can not share a 3000 watt load on one inverter between solar and battery. And some other people had comment that it can share the solar and battery on the same inverter (if the load on a specific inverter is bigger than the solar capacity on that specific inverter). For the sake of not repeating the whole previous discussion in this comment to you, all I need to clarify is the following. Question 1: If the inverter can share the load between solar and battery on the same inverter (if the load on a specific inverter is bigger than the solar capacity on that specific inverter) , then I do not need to get more solar panels. Question 2: If the inverter can not share the load between solar and battery on the same inverter (if the load on a specific inverter is bigger than the solar capacity on that specific inverter) , and the other 2 phases need to keep the batteries charged then I do need to get more solar panels. However, I will go with the comment that Viper_za had made (that it can) .... because it is what I want to hear ... lol... then I will not need to add more panels
-
Axpert MKS 5KVA Inverter - 48V
I am familiar with the parallel option (only what I have read from the manuals), but if I connect the three inverters in parallel, how will I cater for the 3 phases? As you can see I am "exploring" all option not to need to change the inverter, or to increase solar capacity unnecessarily So can someone please comment on the statement from Viper_ZA earlier?
-
Axpert MKS 5KVA Inverter - 48V
Yes it is still connected to the grid, but the whole intention of having the solar panels (and as much as 18 of them), was to use as "little as possible from the grid" (at least during day time when there is full sun), and to cycle the batteries as "little as possible", intention was to keep the batteries full (during the day when there is full sun), and only cycle then when the sun is low, or during the evening. Now it seams I am screwed and either have to consider another Inverter or more solar panels.
-
Axpert MKS 5KVA Inverter - 48V
and if for example phase 2 also go greater than 1860 watts, then that phase will also switch to battery, and the solar for phase 2 will also be "inactive". So are then then back at the point made earlier in the day, that I need to add more solar panels to increase the solar capacity to "way more" than 5580 watts (18 x 310 watt panels), even if my load across the three phases will only be max +- 4000 watts (maybe 5000 watts). A figure was mentioned earlier that 3000 watts per phase (that is 9000 watts solar) to cater for +- 4000 watts (maybe 5000 watts) ??
-
Axpert MKS 5KVA Inverter - 48V
But then it does mean that I will be losing 1860 watts from my total 5580 solar power watts (when for example phase 1 has a load 3000 watts). The other two phases will battle to keep the batteries full (if for example phase 2 has a load of 1500 watt and phase 3 has a load of 1000 watts). Then the surplus of phases 2 and 3 will only be 1220 watts to try and keep the battery full, that is being drained at a rate of 3000 watts (by phase 1). This will mean more cycles. Correct me if I am wrong? All the appliances are 220V
SBBS
Members
-
Joined
-
Last visited