Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

cpbotha

Members
  • Joined

  • Last visited

  1. I just wanted to add my datapoint: Discovered that my GoodWe GW5048D-ES firmware version 1242416 (aka 2424G) was not submitting data to SEMS, then checked but SolarWIFI*** access point completely absent, and WiFi light on the front completely dead. Tried wifi reset (short press button behind meter panel), reload (longer than 3s press) and then even removing the WiFi module completely and keeping disconnected for a minute or more: WiFi light remained dead. Only when I did the full shutdown and cold start (change-over to grid, PV off, grid supply off, ES rotary power switch off, battery disconnect, wait until system dead, reverse process, thanks @Bobster. in thread below) did the wifi fortunately come fully back up, with solidly burning light and data going to SEMS.
  2.    Youda reacted to a post in a topic: Pylontech US3000 installation with Goodwe
  3.    Youda reacted to a post in a topic: Pylontech US3000 installation with Goodwe
  4. Update: Thanks to the GeyserWise manual switches I have just now established that indeed one of the geysers was accidentally moved to the backup circuit during the 60A -> 80A upgrade work. One of the uber patient electricians will hopefully remedy this tomorrow. By the way, GoodWe with BMS and correct SOC works substantially better than out.
  5. I would like to report back on my post-March 2019 model GoodWe GW5048-ES + PylonTech US3000*2 adventures: It turned out that firmware 151507 had a bug w.r.t. the BMS communication with these batteries. After a quite painful process of getting the thing upgraded, we the BMS communication working perfectly. Here also Segen was super helpful. Notes to others: Although the manual says explicitly that one should NOT use EzFlash on post-March 2019 versions of this inverter, and only to use DataSend, the advice we got from Segen was that sometimes, if a flashing procedure went bad, one HAS to do the whole procedure: EzFlash master.out, EzFlash slave.out, datasend .bin, wifi firmware upgrade, reset to factory. In my case, this took the inverter from red fault led always on, to an almost 100% working state. I say almost, because at the moment, the WiFi went a bit wonky (it's mostly up, but sometimes mysteriously down), and the PV Master app is reporting my non-backup-circuit loads as being on the backup circuit.
  6. Congratulations TTT, well done!!
  7. How sure are you about this w.r.t. the newer models? I can find mention of the EzConverter in some of the older manuals, but it's not mentioned in the latest GoodWe ES literature at all. I would like to be corrected. My 9-series S/N GoodWe 5084-ES is not talking BMS to my US3000s yet.
  8. That's indeed what I'm doing at the moment, but of course I would prefer the BMS to work for better charging and better SOC reporting. I've sent GoodWe support an email with details. I will of course report back here if I make any progress.
  9. You can add the US3000, but it has to be the new master battery, i.e. its "link 0" socket is empty, and its link 1 is connected to the link 0 of your second battery, and so on.
  10.    cpbotha reacted to a post in a topic: Pylontech US3000 installation with Goodwe
  11. That would be a post by @Youda let's see if I can link it now: https://powerforum.co.za/topic/2734-axpert-settings-vir-pylontech-35-kw/?tab=comments#comment-52016
  12. This GoodWe officially supports the US3000, at least in the PV master app there's a whole section for US3000 batteries. Have tried three different BMS cables: the one that comes attached to the goodwe, the one that comes with the pylontech cable pack, and a separate patch cable I usually use to connect one of my laptops to ethernet hub. No dice. Will consider trying crossover tomorrow... It does look like the dip switch settings were wrong. According to the below post by Yoda, and further readings of the manual, dip switches on both pylontechs should be all 0. However, doing this and powercycling the batteries does not seem to have helped. I'll open op the GoodWe again tomorrow morning to make sure the BMS cable is securely in the internal RJ45 socket. (ARGH ARGH ARH why is sitelock blocking my replies?! I was quoting a post by Yoda on this site, and then sitelock blocked my replies numerous times. Really?)
  13. We're having similar problems with a just-installed newer GoodWe with explicit support for US3000. GoodWe 4.6 ES (beige) with 2 x US3000: tried the cable delivered with the goodwe, tried another ethernet cable confirmed working with laptop, tried the cable delivered with the PylonTech connection kit: Battery Communication Fail. @Niel let's keep each other up to date.
  14. @Rautenk can you shed some more light on #2? My application for the 80A was approved, I've paid the people, and work is about to be scheduled. I didn't mention anything about SSEG on my application, although it is in fact the plan to integrate the GoodWe 4.6kVA ES. However, there are 6 people living on my premises, so maybe that helped the request?
  15. Not exactly. CoCT also defines grid-tied as "connected to the utility grid either directly or through a consumer’s internal wiring". For the sake of these definitions, even if your inverter is for some or other reason not capable to feed back into the grid, but it's still connected to the grid in order to be able to use incoming AC, it is still classified as grid-tied.
  16. I'm just trying to keep things in perspective. If this is the same prepaid meter than the one CoCT would have put in any way (at my cost), then indeed the upgrade cost is "only" the R5k SNC. In the end we pay, that we don't have much control over. We do have some degree of control over how we feel about that. (that's true about many things in life.
  17. I have asked the CoCT to explain what the shared network charge (SNC) is for. Also, RED Engineering (my amazing solar installer) warned that CoCT would replace my meter with a prepaid one in any case, even if I didn't request the 80A upgrade, simply due to the SSEG system.
  18. After more than a month of waiting, and repeated contact with CoCT (during these occasions they were always friendly and helpful, the whole process just takes so long), I finally received my quote for the 60A to 80A upgrade. The quote is identical to that of @Niel: 7231.95 in total, consisting of the R5k shared network charge, and the single phase split prepayment meter. (the wording is also identical) I did not mention *anything* about SSEG in my application, I only requested the 60A to 80A upgrade. My only reason for doing this is indeed the sign-off of a soon-to-be-installed GoodWe 4.6kVA inverter. The planned system is zero feed-in. I am going to pay, because I want to have my system signed-off, but this does leave a bitter taste in one's month.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.