Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Neb

Members
  • Joined

  • Last visited

Reputation Activity

  1. Like
    Neb reacted to ___ in Urgent Help: City of CT Cutting Off Axperts   
    That's the bit I find a little ridiculous. The fact that it has a built-in SCC doesn't give it magical capabilities. The proof of this is that 1) the Axpert which is a UPS that happens to have an SCC in the same box is now questioned, while the Multiplus which has no SCC in the box (but has the magic capabilities) is exempted.
    It would seem to me that the simplest thing to do is put in the change-over switch, get the paperwork done to get them off your back. But now that makes me wonder how you'd install such a change-over. Because it seems to me that the bit that worries them (or should worry them) is the input side. Disconnect it from the grid and the whole thing becomes legal, right?
    It isn't grid-tied! The SSEG regulations don't apply to off-grid inverters. Other regulations might apply though... that is the thing. They are throwing the wrong book at him.
     
    They still can't feed back even if you do add an MPPT. I know people who added solar charging to existing grid-interactive UPSes so they last longer during load-shedding. And as I said, the irony is that there are MPPT-less inverters that CAN feed back which is now hilariously excluded from scrutiny.
    It comes down to this:
    1. What regulations do you need to comply with?
    2. What do you need to do to be compliant.
    It seems to me that what you need to do is disconnect the input of the Axpert from the grid. Do that, get the paperwork done. That way they don't come knocking again because the bill is too low, because you have the paperwork.
  2. Like
    Neb reacted to ___ in Urgent Help: City of CT Cutting Off Axperts   
    The list only applies to embedded generators. The Axpert is not an embedded generator and never can be. If it ever accidentally does so (that is, accidentally latch the transfer switch while the inverter is active), it will simply blow up. So that it isn't on the list is immaterial.
    Second point: A UPS is an off-grid solution. A UPS has an automatic transfer switch. Far as I know, you are allowed to connect a UPS to the Eskom grid. There might be some boxes it has to tick, for example, it probably needs an SABS mark or something similar. This is what you have to check.
    Third point: Once again, that's for embedded generators. You are allowed to connect a generator to your house, and that is allowed to be larger than 3.5kva, and it may even have an automatic changeover as far as I know.
    The only thing you need is a CoC by a qualified electrician.
    The challenge is going to be to prove that it is a UPS.
  3. Like
    HI Guys,
    Dropped pricing on the inverters.
    Victron Multiplus 5kVA/48V
    Price: R32 500  R31 000 and I'll include a MK2-USB interface for programming and firmware update
    SMA Sunnyboy SB4000-TL21 
    Price: R19 000  R17900 Negotiable
    Let me know if you are interested
    Nick
  4. Like
    Neb reacted to Mark in Solar System (PV) Labeling   
    I'm going to fiddle tommorrow and I'll send you what I have at the moment.  We can work together on it.  I have no issue with then posting it to the downloads section...<typing thoughtfully> ...for other users to freely use.  
    If you can help with printing to sticky sheet that would be mooi.  A4 yes.  The way to go!!  You then cut and stick where needed.
    Thanks 
    Mark
  5. Like
    Neb reacted to SilverNodashi in Imeon 9.12   
    which temp sensors do you have? I use a Raspberry pi to log DS18B20 temp sensors to emoncms.org. The code is very simple and I can send it to you if you want?
  6. Like
    Neb reacted to Mark in Imeon 9.12   
    Hi Neb.  Measure the resistance of the cable and exclude the batteries.  In order to balance the batteries you need to get the string(cable) resistance as equal as possible.
    Lets me also say.  The system is the envy of many here including myself.  Maybe why we are all keen for it to be as perfect as it looks  My 2c anyway.
  7. Like
    Neb reacted to Chris-R in Imeon 9.12   
    Hi Neb
    I love your system and especially the grey beast you putting so well on show here !!!!
    Regrettably, I have to agree with Silvernodashi and Superdiy ( The SS twins ....lol!! ) regarding your cabling. It is a recipe to destroy your investment. Remove the cables from pos. and neg. mains of each string and replace with four sets of black & red, all exactly the same length. ( The length of the longest cable required) Put 2 busbars on the wall underneath your existing fuses and fit all the neg & pos. cables to the busbars . You've already got 2 fuses, just add another 2 and put them on your neg. / or pos. cables just before the busbar. From the busbar 2 cables to your Imeon. If you want to you could add a 200amp DC circuit braker between your busbars and the imeon for security. Cables sorted and it would be definitely much cheaper than replacing the batteries in a year's time.
    You could use one HA-02 like the twins has suggested, would work perfectly, but a lot of wiring. I opted for 4 x HA-02 equalisers, one for each string and within days my bank was just about 100% balanced. With an investment like yours, I would definitely invest in a BMV 702 and have peace of mind forever.
    Don't take me on Superdiy, you know I'm scared of you !!
    Cheers
  8. Like
    Neb reacted to Mark in Imeon 9.12   
    Neb.  On top of the Merson DC Disconnect I use these fuses on each of my strings before the busbar.
    Personally I would mount the busbars above the bank below the DBboards.  You can then make each string connection as short as possible.  Top same length as bottom though.  You can then run really thick cable between the BusBars and the Merson.
    I have a separate HA02 for each string.  Initially I also had one across 2 strings but I have found that they perform better with an HA02 per string.  Less wires and fuses as well AND the HA02 are only rated @ max 10A so given your loads and inverter one will not be enough for 2x strings. (I believe).
     

  9. Like
    Neb reacted to Don in Imeon 9.12   
    Nice house @Neb. I am envious of the blue sky. Was that photo shopped? 
  10. Like
    Neb reacted to SOLARWIND in Imeon 9.12   
    Yes, the Imeon is one of the approved inverters for grid connection.
  11. Like
    Neb reacted to superdiy in Imeon 9.12   
    This was discussed many times here on the forum.  If you have parallel battery strings you need to ensure that the cable lengths in each string is of the same length and type in order to use (discharge) and charge each string equally. The easiest method is to add busbars and the have equal length cables between the batteries and the busbars. You already have equal lengths and types of interlink cables between the batteries in each string, but the ends of the strings are not connected optimally and therefor the strings will not be utilized equally.

    Another must have, besides the fuse / breaker between the battery bank and the inverter is a fuse per string - also discussed a few times on the forum.
    If everything is connected as described above, you can get away with only 1 x HA-02 battery balancer.

     
  12. Like
    Neb got a reaction from superdiy in Imeon 9.12   
    Sent from my iPhone using Tapatalk
  13. Like
    Neb got a reaction from ibiza in Imeon 9.12   
    Hi Chris. The other thing to consider, the electricity department hates these systems. If your PV modules are visible you can expect a visit from them. If your system is going to be a stand-alone off-grid setup then you should have minimal hassle. My setup still has an old analogue meter that's located inside my property, the Authotities are now forcing me to change to a prepaid meter. I'm being harassed and forced to do things that benefit them and not me. They are treating me like a criminal. Funny thing is, if you read the papers it looks like they are encouraging solar and energy efficient systems, don't be fooled, they only encourage it if it belongs to them. I'm now looking at adding a few more panels, getting a massive lithium bank and going off grid completely. If you or anybody ever have hassles like this you need to let an energy manager like Ikapa Power Management handle the situation, they know all the laws and have the ability to audit your account and rectify any over billing etc, don't allow anyone to bully you.


    Sent from my iPhone using Tapatalk
  14. Like
    Neb reacted to HeinTheTerrible in Imeon 9.12   
    Phoned and they say it still hasn't cleared customs, not waiting for payment or anything. Nearly a month now, it can't possibly take that long!
    Lucky you!
  15. Like
    Neb reacted to HeinTheTerrible in Imeon 9.12   
    Do I phone 0860 111 502?  
  16. Like
    Neb reacted to Chris-R in Imeon 9.12   
    HI Guys
    Just a quick update on the HA02 order
    Your parcel information
    Summary: Airwaybill Number: 6674996160 OriginService Area: Hong Kong - Hong Kong DestinationService Area: Johannesburg Outlying - South Africa Status: Shipment picked up as of: November 29, 2016 14:21
    Details:
    1 - November 29, 2016 14:21 Hong Kong - Hong Kong Shipment picked up
     
    Cheers
    2016-11-29 22:13:00,Departed Facility in HONG KONG - HONG KONG, HONG KONG - HONG KONG 2016-11-29 21:34:00,Processed at HONG KONG - HONG KONG, HONG KONG - HONG KONG 2016-11-29 18:45:00,Arrived at Sort Facility HONG KONG - HONG KONG, HONG KONG - HONG KONG 2016-11-29 14:21:00,Shipment picked up, HONG KONG - HONG KONG
  17. Like
    Neb got a reaction from SOLARWIND in Imeon 9.12   
    Beyond expectations! But I haven't moved in yet, it's been running the power tools on site very well.


    Sent from my iPhone using Tapatalk
  18. Like
    Neb reacted to HeinTheTerrible in Imeon 9.12   
    I know the panels are already installed but you should consider removing the panels on the edges. The wind load on the outer edges of the solar array is something you should be concerned about . Best practise is to mount the panels at least 600mm from the edges of the roof otherwise your solar panels will turn into wind sails.
    Solar panels should be on top of roofs, not floating in the pool 
  19. Like
    Neb got a reaction from SOLARWIND in Imeon 9.12   
    Sent from my iPhone using Tapatalk
  20. Like
    Neb got a reaction from ___ in Victron Multiplus Hub-4 working   
    Lexus!


    Sent from my iPhone using Tapatalk
  21. Like
    Neb got a reaction from SilverNodashi in Victron Multiplus Hub-4 working   
    Lexus!


    Sent from my iPhone using Tapatalk
  22. Like
    Neb reacted to PaulF007 in Honda Eu10i   
    Nice work on the Beatle ( See it got a scrub for the photo opp )
     
  23. Like
    Neb got a reaction from PaulF007 in Honda Eu10i   
    The beetle is still a work in progress, there's a sneak peek.


    Sent from my iPhone using Tapatalk
  24. Like
    Neb got a reaction from HeinTheTerrible in Honda Eu10i   
    The beetle is still a work in progress, there's a sneak peek.


    Sent from my iPhone using Tapatalk
  25. Like
    Neb got a reaction from ___ in Honda Eu10i   
    The beetle is still a work in progress, there's a sneak peek.


    Sent from my iPhone using Tapatalk

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.