Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Keith

Members
  • Joined

  • Last visited

Reputation Activity

  1. Like
    Keith got a reaction from Scorp007 in Off grid farm plus pivot irrigation   
    For domestic I used 8kW victron Multiplus II with a 250/85 charge controller and 8x555 Wp panels and 3 eTower batteries.
    For the Pivot I used 36 x 555 Wp panels in 2x 18 strings on EM Heater solar VSD’s. 1 11 kW vsd for a 9.2kW borehole pump and a second vsd 15kW (over sized to handle dol wheel supply) for the pivot drive.
    1 string of 18 of the pivot panels has dual function with a change over to a 5 kW Fronius on the Multiplus (ac coupled). When pivot is not running, the fronius soaks up early and late solar.

  2. Like
    Keith got a reaction from Paul.Chari in 3 Phase Off grid.   
    Off grid 3 phase system. 3 x 8 kW Multiplus II, with a 3 ph 6 kW Fronius on AC couple, 3 victron charge controllers. Total 36 x 545 Wp ja solar panels. Old lister 3 phase gen on multi ac input. 4 x eTower 5000 batteries.
    If anyone has done an AVR on old generator it would help this old Kit. Hoffberg alternator, 7 kVA. Excitation 12 V 5 Amp.

  3. Like
    Keith got a reaction from Demo in 3 Phase Off grid.   
    Off grid 3 phase system. 3 x 8 kW Multiplus II, with a 3 ph 6 kW Fronius on AC couple, 3 victron charge controllers. Total 36 x 545 Wp ja solar panels. Old lister 3 phase gen on multi ac input. 4 x eTower 5000 batteries.
    If anyone has done an AVR on old generator it would help this old Kit. Hoffberg alternator, 7 kVA. Excitation 12 V 5 Amp.

  4. Like
    Keith got a reaction from zsde in Off grid farm plus pivot irrigation   
    For domestic I used 8kW victron Multiplus II with a 250/85 charge controller and 8x555 Wp panels and 3 eTower batteries.
    For the Pivot I used 36 x 555 Wp panels in 2x 18 strings on EM Heater solar VSD’s. 1 11 kW vsd for a 9.2kW borehole pump and a second vsd 15kW (over sized to handle dol wheel supply) for the pivot drive.
    1 string of 18 of the pivot panels has dual function with a change over to a 5 kW Fronius on the Multiplus (ac coupled). When pivot is not running, the fronius soaks up early and late solar.

  5. Like
    Keith got a reaction from Solo in Keith’s Solar project   
    Phase 3 now completed. I have moved all DC into a db of its own. DB for AC change over and fronius input. Add a 250/70 smartSolar charge controller with 8 x 370 Wp artsolar panels. Added a smart switch to prevent the fronius tripping the system when the grid fails.
    phase 4 will be to add 2 more batteries that i bought in July 2019 and still waiting for a certain Mr Jacco Jackson to deliver.
    now i have:
    15x310 Wp in series on a fronius 4 kW grid tie connected via an acdc smart switch to AC1 out of a multiplus 5kW.
    8x370Wp on a smartsolar 250/70 (2banks of 4)
    2x EMS 48100A1 li-ion batteries.
    Eskom must do what they like...



  6. Like
    Keith got a reaction from P1000 in Keith’s Solar project   
    Phase 3 now completed. I have moved all DC into a db of its own. DB for AC change over and fronius input. Add a 250/70 smartSolar charge controller with 8 x 370 Wp artsolar panels. Added a smart switch to prevent the fronius tripping the system when the grid fails.
    phase 4 will be to add 2 more batteries that i bought in July 2019 and still waiting for a certain Mr Jacco Jackson to deliver.
    now i have:
    15x310 Wp in series on a fronius 4 kW grid tie connected via an acdc smart switch to AC1 out of a multiplus 5kW.
    8x370Wp on a smartsolar 250/70 (2banks of 4)
    2x EMS 48100A1 li-ion batteries.
    Eskom must do what they like...



  7. Like
    Keith got a reaction from DeepBass9 in Keith’s Solar project   
    I started research into solar 2 years ago. Choose to go with a Fronius Primo 4.1. Great that it has 2 mppt and 1000 V DC. Commissioned 1 Jan 2018. Have 15 renewsys 315 Wp on MPPT1.
    just added a Victron Multi, ccgx and li-ion batteries to the system so that i can more fully utilize excess solar.



  8. Like
    Keith got a reaction from Jaco De Jongh in Keith’s Solar project   
    I started research into solar 2 years ago. Choose to go with a Fronius Primo 4.1. Great that it has 2 mppt and 1000 V DC. Commissioned 1 Jan 2018. Have 15 renewsys 315 Wp on MPPT1.
    just added a Victron Multi, ccgx and li-ion batteries to the system so that i can more fully utilize excess solar.



Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.