Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Back up installation

Featured Replies

Good day all, I am new to the forum. I recently had a back up system installed, Luxpower 5kw inverter and Dyness 4.8kwh Li-ion battery. Please have a glance at my installation and let me know if any pointers/recommendations?

Thank you

BackUp.jpg

10 minutes ago, Mdu Dube said:

Good day all, I am new to the forum. I recently had a back up system installed, Luxpower 5kw inverter and Dyness 4.8kwh Li-ion battery. Please have a glance at my installation and let me know if any pointers/recommendations?

Thank you

BackUp.jpg

  1.  No DC fuses protecting your battery. 

Hi Mdu

Welcome to the forum and to not having to worry about LS 🙂 Luxpower and Dyness are decent items. Your installer seems to have taken some short cuts that will compromise the integrity of the install - as pointed out by @Antonio de Sa you need to have DC fuses between the Inverter and battery. The breakers on the right of the pic are also usually enclosed in an electricly safe box so that they are not activated by mistake or cause electric shocks to users. these 2 things need to be remedied at the very least

  • Author

Thank you very much all, and do you only get a COC after panels are installed or should it also be issued just with a back up system?

Edited by Mdu Dube

19 minutes ago, Mdu Dube said:

Thank you very much all, and do you only get a COC after panels are installed or should it also be issued just with a back up system?

If the AC supply to your inverter comes directly from your main DB and the AC output from the inverter feeds back to your DB, you need a COC, other thing to look for and one cannot see from your Picture is the size of the wiring, depending how far the inverter is from your main DB, to work out the voltage drop,  taking in consideration that is a 5 KW inverter it has to be at least 6 mm2. 

22 hours ago, Mdu Dube said:

Thank you very much all, and do you only get a COC after panels are installed or should it also be issued just with a back up system?

You need your COC now presuming the system is live. The installer can issue a supplementary COC once the panels have been installed.

Somethings to look out for. Have surge arrestors been installed in the main DB. Is the inverter feeding all circuits or only those you have identified as being essential during load shedding. Has your installer explained to you how your system is protected, e.g. at what point of discharge will your battery shut down: how do you isolate your inverter / battery should you need to, etc.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.