March 3, 20242 yr I have an 8kw Deye setup and thinking about getting Solar Assistant to schedule changes of the work mode (zero export to load/CT). I have not seen any evidence that you can actually do this on Solar Assistant. Can someone please confirm if this is possible? I don't have the installer permission on the inverter so the Deye Cloud or Solarman Business is not an option. What I want to achieve is use the PV during the day to power the geyser which is non essential but don't want it to only power essential loads when PV is not available. This works when manually switching work modes but want to be able to control remotely or schedule this.
March 3, 20242 yr Yes, SA does allow you to do this. There is actually quite a lot that you can manage via the app. Not an investment you will regret purchasing. MdF
March 4, 20242 yr Author Thanks for the screenshot, this is for the work mode timer. If you click on Inverter settings can you edit the work mode? Want I want to do is switch between "Zero Export to Load" and "Zero Export to CT" using SA.
March 4, 20242 yr 40 minutes ago, jjmoodley said: Thanks for the screenshot, this is for the work mode timer. If you click on Inverter settings can you edit the work mode? Want I want to do is switch between "Zero Export to Load" and "Zero Export to CT" using SA. Ah so this screen then
March 5, 20242 yr On 2024/03/04 at 5:41 PM, jjmoodley said: Thanks @mzezman, exactly what I was looking for. Happy to help
March 8, 20242 yr Author Got SA setup and configured the automation. If this works it will pay for itself in a few months. Hoping it goes back to default mode after 3pm.
March 9, 20242 yr Great feature. How hard could it be for Deye to write this automation into the firmware on the Time-of-Use work mode screen?
March 9, 20242 yr Author 1 hour ago, GreenFields said: Great feature. How hard could it be for Deye to write this automation into the firmware on the Time-of-Use work mode screen? 100%, the Deye Firmware and Deye Cloud features need an update. There is so much they can do better very easily.
September 30, 20241 yr These tables are what I am trying to modify through SA, but it's not having it. Any value I try to change in the work mode timer or if I try to switch the use timer on or off through automation, nothing happens. I am trying this with a Deye 12K inverter. I don't know what to do now?
October 1, 20241 yr 13 hours ago, awalsum said: These tables are what I am trying to modify through SA, but it's not having it. Any value I try to change in the work mode timer or if I try to switch the use timer on or off through automation, nothing happens. I am trying this with a Deye 12K inverter. I don't know what to do now? https://solar-assistant.io/help/deye/configuration
October 1, 20241 yr I have a Deye 3 phase. It looks like the RS485 is read only and that is causing my issue.
November 18, 20241 yr On 2024/03/04 at 8:43 PM, jjmoodley said: Thanks for the screenshot, this is for the work mode timer. If you click on Inverter settings can you edit the work mode? Want I want to do is switch between "Zero Export to Load" and "Zero Export to CT" using SA. What do you anticipate will be different between these two modes? That Zero Export to Load will only use solar and battery to power the Load terminals and not the home load, and that zero Export to CT will power both?
November 19, 20241 yr Author Yes, that's exactly what happens. I for example don't have my geyser connected to the normal load but in Zero Export to CT the solar or battery will be used to power the geyser. I can confirm this works as described above. It allows me to stay on zero export to Load on days/times solar generation is not great so I don't run down the battery. Also once the battery is full I can use the solar to power the geyser or heat pump which is not connected as normal load. Edited November 19, 20241 yr by jjmoodley Grammar
November 27, 2025Nov 27 Hi,Just hoping to get some clearer info for myself before purchasing.We have a Deye 12kW inverter.Three operatimng modes: 1. Selling 2. Zero Export to CT and 3. Zero Export to Load.So is it definitely possible to automate SA to change between those modes automatically with time based rules? I need to change from Zero Export to CT to Selling at a set time period.Thank you