November 22, 20214 yr ..so the City of Cape Town now wants me to "install a reverse power flow blocking protection system that permanently prevents reverse power flow onto the City's electricity grid". I have a Sunsynk inverter not exporting to grid. I've asked the question if this means I require additional protection as opposed to the Sunsynk preventing export via the CT coil, but no answer thus far. Can anyone suggest what they really want/has anyone implemented such a device? Thanks in advance.
November 22, 20214 yr The Sunsynk is on the CoCT approved inverter list and, yes, the ct coil is sufficient
November 23, 20214 yr Author I would be interested if anyone else in Cape Town was forced to implement anything else part from the compliant inverter, or implemented additional reverse power flow blocking themselves. Thanks in advance.
November 23, 20214 yr What reverse power flow blocking options are there, outside of the CT clamp option, though? Is that the new meter? If so - any option apart from that that would suffice in the COCT 'rules'?
November 23, 20214 yr Author 1 hour ago, JoeyhZA said: What reverse power flow blocking options are there, outside of the CT clamp option, though? Is that the new meter? If so - any option apart from that that would suffice in the COCT 'rules'? I'm interested in this question regarding the meter, since CoCT recently replaced my original prepaid meter to a split-prepaid meter - are you suggesting that this can block reverse power flow?
November 23, 20214 yr that is what the technician also told me when they replaced my old prepaid meter with the split prepaid meter last year in Cape Town
November 23, 20214 yr Author 1 hour ago, Tariq said: that is what the technician also told me when they replaced my old prepaid meter with the split prepaid meter last year in Cape Town They have a very strange way of explaining themself if that is the case: " It is a requirement that you install a reverse power flow blocking protection system that permanently prevents reverse power flow onto the City's electricity grid." Next paragraph " The existing meter needs to be replaced. The MRP notification number for this replacement is ..." The technician replacing my meter had no idea why he was asked to replace my meter.
November 23, 20214 yr If they installed a new split prepaid meter then I wouldn't worry - these meters do accept small amounts of grid feed in for which you pay in reduced units from the meter. I use about 100 to 200 watts a day with my Sunsynk 5kW set for Zero feedback (zero export) Edited November 23, 20214 yr by Pumba
November 23, 20214 yr @Pumba, mine is set at 20 watts, not sure why, seems everyone does so, so assume you don't have any issues with it set at zero.
November 23, 20214 yr 2 hours ago, Tariq said: @Pumba, mine is set at 20 watts, not sure why, seems everyone does so, so assume you don't have any issues with it set at zero. Installers manual V7 - Nov 2021 - https://www.sunsynk.org/manuals - Page 48: Quote 4. ‘Zero Export Power’ is the amount of power flowing from the Grid to the Inverter. Set this value to ’20 - 100W’ to instruct the inverter to always take the prescribed amount of power from the Grid to minimise the tripping of sensitive pre-paid electricity meters if ‘Reverse Power Detection’ occurs. Edited November 23, 20214 yr by system32
November 23, 20214 yr Author 4 hours ago, Pumba said: If they installed a new split prepaid meter then I wouldn't worry - these meters do accept small amounts of grid feed in for which you pay in reduced units from the meter. I use about 100 to 200 watts a day with my Sunsynk 5kW set for Zero feedback (zero export) @Pumba can you clarify what you mean by "you pay in reduced units from the meter"?
November 24, 20214 yr On 2021/11/22 at 3:16 PM, shovelhead said: ..so the City of Cape Town now wants me to "install a reverse power flow blocking protection system that permanently prevents reverse power flow onto the City's electricity grid". I have a Sunsynk inverter not exporting to grid. I've asked the question if this means I require additional protection as opposed to the Sunsynk preventing export via the CT coil, but no answer thus far. Can anyone suggest what they really want/has anyone implemented such a device? Thanks in advance. Very strange! I'm afraid time will come when they will beg customers on their knees to feed back to the grid.
November 24, 20223 yr I see this is a pretty old thread, but has anyone become any the wiser? I now also have these requirements thrown at me and do not understand the implications.
November 24, 20223 yr 7 minutes ago, Rodbuilder said: I see this is a pretty old thread, but has anyone become any the wiser? I now also have these requirements thrown at me and do not understand the implications. If you bought a Sunsynk or Deye system then the required device is known as the CT Coil that is included in the installation. Not sure about other inverter systems
December 6, 20223 yr On 2022/11/24 at 3:57 PM, mzezman said: If you bought a Sunsynk or Deye system then the required device is known as the CT Coil that is included in the installation. Not sure about other inverter systems I have a Sunsynk inverter and yes it does have a CT coil. It is largely the Pre Paid meter I don't want but have been told it's a lost cause to try and argue with CtC. Does anyone have a registered on grid system without the Pre Paid meter and blocking device?
July 5, 20242 yr I live in George. The municipality replaced my old meter with a Conlog meter which is apparently very sensitive. The meter is now continually tripping as it picks up the minimal backflow from the inverter. I have a 8Kva Victorn inverter and the in source is split into non-critical loads (geyser and stove) and critical loads (the balance of the house). Conolg say they can issue a token that will reduce the sensitivity of the meter but they need permission from the municipality. The munciplaity say they will not give that permission as the meter can't handle it and will fail. Conolg say that is nonsense but they cannot help without the permission. Municipality say we need to put on a reverse power blocking system. Our solar guy says the inverter is already set to no reverse power and there is nothing else he can do to "block" the minimal amount of backflow that occurs. We are therefore in a very frustrating situation where we cannot get a solution from anyone. I would be eternally grateful if anyone has a solution to this problem
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.