Skip to content
View in the app

A better way to browse. Learn more.

Power Forum - Renewable Energy Discussion

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (โ‹ฎ) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

mzezman

Members
  • Joined

  • Last visited

Everything posted by mzezman

  1. contact the support for your inverter / dongle and get them to release it from the previous plant so that you can add it to yours
  2. is that a question or a statement? in any case if it was a question then the answer is 65kw total PV each MPPT can take 36A current attached is the datasheet DEYE-50KW-DATA-SHEET.pdf
  3. Neutral ground is yet to be established ๐Ÿ‘€ Iโ€™ll see myself out ๐Ÿ˜‚
  4. No image is showing on my end but why would you want to increase inverter size if youโ€™re not utilising the current capacity? Unless I am misunderstanding your question
  5. Welcome to the black hole that is home automation and home assistant ๐Ÿ™‚ Quite an active group on Mybroadband as well if you are a member there. Keen to share and help out whenever we can ๐Ÿ™‚
  6. My driving assumption is that solar will have the batteries at or close to 100% by the end of the day then we use battery until 95% then grid. I've changed it since and that 95% is now 75% so use less grid until 9pm Edit: I can also trigger grid charge manually / via automation if i need to
  7. Its pretty straightforward - I would charge them a beer ๐Ÿ™‚
  8. Yes the Dyness do have a more aggressive throttle to balance compared to other models. Still offer decent value and very few (if any) issues You are the Sunsynk Master now ๐Ÿ™‚
  9. Earth-neutral bonding wasn't done (properly)
  10. Shouldn't be a problem - they just need to be the same battery type and capacity. It shouldn't need its own fuse box and generally you would run another comms cable from the old one to the new one. Not sure how Volts specify doing this but other manufacturers will detail how to parallel
  11. Interesting range of plants you have in your family there - most impressive
  12. Unfortunately there isn't a portal or system available to us end-users - not sure if the installers have a portal view of what the latest is
  13. Im running MCU 3.3.8.4 | SMCU 1.5.1.5 | Comm E42C
  14. mzezman replied to kroopy's topic in Inverters
    can you share your settings from the inverter please so that we can see how its set up - there isn't much information contained in the post above
  15. i do not believe there is a limit - or at least none has been mentioned. I currently have 4 other users with access to my plant (as ordinary users)
  16. Is the comms working ok on these installs with the Volta
  17. Couldn't even crack 4k PV today Dec 23
  18. 500 is a bit extreme, mine increased by about 100 in total
  19. The normal light is not on so something wasn't setup / wired properly.
  20. I think this is why one shouldn't ever bet their whole architecture on one ecosystem. And what makes HomeAssistant / Matter so good for consumers.
  21. any shading on the panels when you did the test? even partial shading?
  22. probably how they were installed - do you know whether the installer installed all 6 on one mppt
  23. Should be fine generally as long as that 8kw has enough airflow for the hot days

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.